Laserfiche WebLink
�- <br />10. Amount of water claimed (ABSOLUTE): instream flow of 0.45 cfs (April 1 — September <br />30). <br />11. The Colorado Water Conservation Board has an existing instream flow water right on <br />Beaver Creek from the confluence with an unnamed tributary to the confluence with the <br />Colorado River, in the amount of 1.5 cfs (1 /1- 12/31), decreed in case 5- 86CW206 with <br />an appropriation date 3/14/1986. The flow rates decreed herein are in addition to the <br />amount of the existing instream flow right. <br />CONCLUSIONS OF LAW <br />12. Notice and Jurisdiction. The Water Court for Division 5 has jurisdiction over the subject <br />matter of these proceedings and over all persons, owners of property and water rights that <br />may be affected hereby, whether or not they have chosen to appear. The application in <br />this matter and the resume publication of the application placed such persons on notice of <br />the relief requested by the application and granted by this decree. § §37 -92 -203 and 302 <br />C.R.S. (2008). <br />13. The CWCB has fulfilled all legal requirements for a decree for water rights including <br />§§ 37 -92 -302, 304 and 305, C.R.S. (2008). <br />14. Burden of Proof. The CWCB has complied with all requirements, has met all standards <br />and burdens of proof to adjudicate the water rights requested in the Application and is <br />therefore entitled to a decree approving the requested water rights. <br />JUDGMENT AND DECREE <br />15. The foregoing Findings of Fact and Conclusions of Law are hereby approved and <br />incorporated as the Judgment and Decree of the Court by this reference. <br />16. The Application is granted and the Court hereby approves and decrees the absolute water <br />rights described herein, in the amount 0.45 cfs (April 1 — September 30) in order to <br />preserve the natural environment to a reasonable degree in the reach of Beaver Creek <br />between the upstream and downstream terminus points described in paragraph 7 above. <br />The appropriation date for this water right is January 23, 2008, <br />17. The priority herein awarded was filed in the water court in the year of 2008 and shall be <br />junior to all priorities filed in previous years. As between all rights filed in the same <br />calendar year, priorities shall be determined by the historical date of appropriation and <br />not affected by the date of entry of ruling. The Applicant shall install and maintain such <br />measuring devices and keep such records as the Division Engineer may require for <br />administration of this right. <br />