My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-08CW100 Final Decree/Stipulations
CWCB
>
Instream Flow Appropriations
>
DayForward
>
1-1000
>
5-08CW100 Final Decree/Stipulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:32:36 PM
Creation date
7/13/2010 11:34:11 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
08CW0100
Stream Name
Rabbit Ears Creek
Watershed
Colorado River
Water Division
5
Water District
50
County
Grand
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. Amount of water claimed (ABSOLUTE): Instream flow of 5.0 cfs (April 1— October 31), <br />2.2 cfs (November 1 — March 31). <br />CONCLUSIONS OF LAW <br />11. Notice and Jurisdiction. The Water Court for Division 5 has jurisdiction over the subject <br />matter of these proceedings and over all persons, owners of property and water rights that <br />may be affected hereby, whether or not they have chosen to appear. The application in <br />this matter and the resume publication of the application placed such persons on notice of <br />the relief requested by the application and granted by this decree. §37 -92 -203 and 302 <br />C.R.S. (2008). <br />12. The CWCB has fulfilled all legal requirements for a decree for water rights including <br />§§ 37 -92 -302, 304 and 305, C.R.S. (2008). <br />13. Burden of Proof. The CWCB has complied with all requirements, has met all standards <br />and burdens of proof to adjudicate the water rights requested in the Application and is <br />therefore entitled to a decree approving the requested water rights. <br />JUDGMENT AND DECREE <br />14. The foregoing Findings of Fact and Conclusions of Law are hereby approved and <br />incorporated as the Judgment and Decree of the Court by this reference. <br />15. The Application is granted and the Court hereby approves and decrees the absolute water <br />rights described herein, in the amount of 5.0 cfs (April 1 — October 31), 2.2 cfs <br />(November 1 — March 31) in order to preserve the natural environment to a reasonable <br />degree in the reach of Rabbit Ears Creek between the upstream and downstream terminus <br />points described in paragraph 7 above. The appropriation date for this water right is <br />January 23, 2008. <br />16. The priority herein awarded was filed in the water court in the year of 2008 and shall be <br />junior to all priorities filed in previous years. As between all rights filed in the same <br />calendar year, priorities shall be determined by the historical date of appropriation and <br />not affected by the date of entry of ruling. The Applicant shall install and maintain such <br />measuring devices and keep such records as the Division Engineer may require for <br />administration of this right. <br />It is accordingly ORDERED that this Ruling shall be filed with the water clerk subject to <br />judicial review. <br />It is further ORDERED that a copy of this Ruling shall be filed with the Division <br />Engineer and the State Engineer. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.