My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposed Workplan for Yampa River Basin Sediment Monitoring Program with Notes
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Proposed Workplan for Yampa River Basin Sediment Monitoring Program with Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 12:37:40 PM
Creation date
7/9/2010 2:34:58 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Yampa River Management Team
State
CO
UT
WY
Basin
Yampa/White/Green
Water Division
6
Date
5/7/1997
Author
U.S. Fish and Wildlife Service, George Smith
Title
Proposed Workplan for Yampa River Basin Sediment Monitoring Program with Notes
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />VIII. FY -98 Work <br />Deliverables: <br />The field work will be performed between early April and late summer, as described above, <br />and the annual report will be completed by October 1, 1998. <br />Budget: <br />By Task: <br />A. <br />$ 5,000 <br />B. <br />$ 7,400 <br />C. <br />$ 35,800 <br />D. <br />$ 19,100 <br />E. <br />$ 25,000 <br />F. <br />$ 42,600 <br />G. <br />$ 39,500 <br />H. <br />$ 10,000 <br />L <br />$ 2. 000 <br />Total <br />$186,400 <br />FY -99 Work: <br />Deliverables: <br />By Cost Category: <br />Labor: <br />$139,900 <br />Travel: <br />$ 15,200 <br />Equipment: <br />$ 1,900 <br />Other <br />$ 29.400 <br />Total: <br />$186,400 <br />The field work will be performed between early April and late summer, as described above, <br />and the annual report will be completed by October 1, 1999. <br />Budget: <br />By Task: <br />A. <br />$ <br />5,300 <br />B. <br />$ <br />7,800 <br />C. <br />$ <br />37,600 <br />D. <br />$ <br />20,100 <br />E. <br />$ <br />26,200 <br />F. <br />$ <br />44,700 <br />G(1). <br />$ <br />41,400 <br />H. <br />$ <br />0 <br />L <br />$ 2.000 <br />Total <br />$185,100 <br />IX. Budget Summary <br />FY-1998:$186,400 <br />FY -1999: $185,100 <br />X. Reviewers <br />By Cost Category: <br />Labor: <br />$146,800 <br />Travel: <br />$ 15,900 <br />Equipment: <br />$ 1,900 <br />Other: <br />$ 20.300 <br />Total: <br />$185,100 <br />S. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.