My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150244 approval ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150244 approval ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:11:05 AM
Creation date
7/8/2010 1:26:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150244
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wood Lake Mutual Water and Irrigation Company <br />January 23-24, 2007 <br />Agenda Item 9g <br />concrete or ductile iron pipe. A new concrete gate tower would be constructed and act as the <br />control for the outlet and service spillway, and the outlet operator and gate would also be <br />replaced. <br />Alternative 3, Line the Existing Outlet Conduits — This option considered lining the outlet <br />conduit and the spillway conduit with either an HDPE (high density polyethylene) Liner or using <br />and In-situ Form (in-place) lining process. Inspection of the outlet indicated that installing a <br />liner pipe within the existing conduits was not possible. In addition, other structural and riprap <br />work be required at the inlets and outlets to bring the conduits up to current standards. <br />Selected Alternative 2, Replace the Existing Outlet Works — The Company has chosen <br />Alternative 2 which is the full replacement of the outlet works and service spillway. Work <br />included in Alternative 2 is as follows: <br />1. Breach the dam embankment and remove existing outlet works. <br />2. Replace existing outlet with 30-inch diameter concrete pipe bedded on concrete. <br />Control structures include the intake structure with gate, gate tower with control gate, <br />and energy dissipation outlet structure. <br />3. Install toe drain at the dam embankment toe to intercept seepage. <br />4. Construct service spillway, incorporated into the outlet works, to pass 100-year storm. <br />5. Place riprap and bedding on the upstream face of the dam in the breach area and at the <br />energy dissipation structure. <br />The Total Project cost is estimated to be: <br />1. Engineering Design $ 30,000 <br />2. Construction 177,000 <br />3. Contingency (15°/a) 27,000 <br />TOTAL $234, 000 <br />Schedule — If the loan is approved by the CWCB, design would be completed in March 2007 for <br />submittal to the SEO for design review. Construction would start in September 2007 and be <br />completed in December 2007. A 2-inch waterline owned by North Weld Water District will <br />have to be moved as it interferes with the project construction. A right-of-way permit will be <br />required for excavation in Weld County Road 74. The Corps of Engineers will be contacted <br />concerning 404 permitting, but it is anticipated that the proposed work will not require formal <br />permitting, and will fall under the nationwide permit. <br />Financial Analvsis <br />The total estimated cost of the project is $234,000. WLIC qualifies for an agricultural interest <br />rate. Staff is recommending a maximum loan amount of $210,600 (90% of the estimated <br />project cost) for 30 years at an interest rate of 2.50%. WLIC will pay the 10% local share <br />($23,400) of the project cost from existing cash balances and an increase in assessments. <br />Table 1 is a summary of the financial aspects of the project. A CWCB Loan of $210,600 would <br />have an annual payment of $10,062 (not including the 10% reserve requirement) at the loan <br />terms of 2.50% for 30 years. The WLIC will maintain a reserve fund of $10,062 for the loan <br />from existing Certificates of Deposit (CD's), as discussed below in Creditworthiness. <br />3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.