The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100%) interest in the Borrower's interest in the Project, including <br />approximately 4,800 feet of pipeline and associated access easements, as more <br />particularly described in the attached Deed of Trust ("Collateral"). <br />SECTION 7— ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />Within six (6) months of substantial completion of the Project, Borrower shall make a <br />principal payment to the CWCB of at least $126,000, and the CWCB and BoRROwER <br />shall amend the Loan Contract to reflect the remaining balance, a final loan amount <br />not to exceed $136,600. <br />SECTION 8— CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECT. <br />B. ThG' BORROWER and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwEtz and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROwER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER Shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BoRROwER shall construct the PRO�ECT in accordance with the approved plans <br />Appendix 1 to Loan Contract C150270 <br />Page 2 of 4 <br />