My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150270 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150270 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 12:52:40 PM
Creation date
7/8/2010 11:45:56 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150270
Contractor Name
Headgate 135 Lateral, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />November 19, 2009 <br />NOTICE OF PROJEC'T SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Gordon Barker, President <br />Headgate 135 Lateral, Incorporated <br />3042 Belford Court <br />Grand Juncrion, CO 81504 <br />Re: Contract Number C150270 — Ditch Rehabilitation Project <br />Dear Mr. Barker: <br />Bill Ritter Jr. <br />Govemor <br />james Martin <br />Executive Director <br />Jennifer L. Gunbel <br />CWCB D'uector <br />Dan McAuliffe <br />CWCB Deputy <br />D'uector <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />October 1, 2009. <br />In accordance with the Contract, the Headgate 135 Lateral, Inc. owed $4,229.87 for interest during construcrion, as <br />calculated on the attached spreadsheet. Payment in the amount of $4,229.87 for interest during construction was received and <br />was credited to your account on October 1, 2009. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $5,005.53 is <br />due on October 1, 2010. A principal payment of $100,870.87 (NRCS grant funds) was received and applied to your loan balance <br />of $192,932.86. This payment resulted in a final loan balance of $92,061.99 that your annual payment is based on. A 1% loan <br />originarion fee of $1,910.23 was added, which based on your highest construction cumulative loan balance of $191,022.63. <br />Vaughn McWilliams, our Contract Administrator, will be amending the Promissory Note, contained as Appendix 2 of the <br />Contract, to reflect the final contract loan amount. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Boazd to work with the Headgate 135 Lateral, Incorporated <br />on the successful completion of this project. Please call if you have any quesrions regarding this matter or if we can be of service <br />to you in the future. <br />Sincerely, ��,,,� <br />Tim Feehan, P,L. <br />Project Mana�,�er, Water Supply Planning and Finance Secrion <br />cc. John Redifer, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Contract Amount = $262,600.00 <br />Expended Amount = $192,932.86 <br />Final Amount = $92,061.99 <br />Flood Protection • Water Supply Planiung and Finance • Stream and Lake Protection <br />Water Supply Protection . Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.