My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Item 1b: Endangered Fish Instream Water Rights for the Yampa River
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Agenda Item 1b: Endangered Fish Instream Water Rights for the Yampa River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 12:54:22 PM
Creation date
7/6/2010 1:29:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Yampa Technical Workgroup
State
CO
UT
WY
Basin
Yampa/White/Green
Water Division
6
Date
12/5/1995
Author
Peter Evans, E. I. Jencsok, CWCB
Title
Agenda Item 1b: Endangered Fish Instream Water Rights for the Yampa River
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o� <br />10. Termination Provision <br />Should the CWCB ask the court to include termination provisions in the decree? <br />Staff recommends that the four provisions currently included in the proposed application <br />be retained. There appeared to be consensus on this matter and clear direction not to <br />simply reference the Enforcement Agreement provisions because they could be modified <br />without the consent of all parties. <br />11. Mitigation Measures <br />If the rights result in increased administrative burdens, how do we mitigate these <br />13 burdens (i.e. install measuring devices or help improve diversion structures)? Staff <br />recommends that the Yampa O &M plan and the Board's Construction Fund be used to <br />help address these issues and nothing on this issue be included in the application. There <br />seemed to be consensus on this approach. <br />12. De Minimus Iniury <br />3 �5 Should the Board apply this standard to both the Base Flow and Recovery Flow <br />t consistent with the Instream Flow Program Rules and Regulations? The issue is <br />under investigation. There appears to be consensus that this is not an issue since the <br />Division Engineer will not enforce these rights until they are decreed. There should be <br />plenty of time during water court proceedings to establish augmentation sources. Staff <br />recommends that application of the Board's standard de minimus rule to the Base Flow <br />Water Right should be sufficient and that no application of the de minimus rule to the <br />Recovery Flow Water Right should occur since the Carve Outs will more than cover this. <br />13. Changes and Exchanges by Seniors <br />How will changes and exchanges be impacted by these rights? The following <br />language was agreed to between water users and environmental interests and staff <br />recommends that this language be included in the proposed application: <br />The decree entered herein will provide that it cannot be used as the basis for the <br />Board to object to future changes of water rights or upstream exchanges of <br />water rights, so long as such changes and exchanges do not cause material <br />injury to the water rights decreed herein. To the extent that such changes or <br />exchanges (a) do not deplete flows in excess of flows available under the "Carve <br />Out" for future development, or (b) do not result in any increase in historical <br />consumptive use, which in the case of changes involving conditional water rights <br />would be determined based on the contemplated draft of such rights at the <br />original point of diversion, there will exist a presumption of no injury. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.