My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa River Basin Water Resources Planning Model Final Report
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Yampa River Basin Water Resources Planning Model Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 1:04:19 PM
Creation date
7/6/2010 11:25:54 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Yampa River Basin
State
CO
UT
WY
Basin
Yampa/White/Green
Water Division
6
Date
2/1/1997
Author
Boyle Engineering Coporation, Riverside Technology, Inc.
Title
Yampa River Basin Water Resources Planning Model Final Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
n <br />4.4.1 Instream Station File - yampaT.isf <br />Table 4.4.1a shows the instream flow reaches included in the Yampa Model along with their location <br />and average annual demand based on decree amount. Section 4.4.2 describes how instream demands <br />were estimated. <br />Phase IIIa enhancements that impact the instream station file include replacing 73 instream flow <br />points with 15 instream flow reaches. This enhancement, which involved revising the StateMod <br />program, was implemented to satisfy instream flow decree requirements. Secondly, an instream <br />flow reach was added to the Yampa model on Dome Creek, a Bear River tributary that was newly <br />included under Phase IIIa. Appendixes D.1 and D.12 describe these Phase IIIa enhancements. <br />4.4.2 Instream Demand File- yampaT.ifa <br />Instream flow demands were developed from decreed amounts and comments in the state engineer's <br />water rights tabulation. Twelve monthly instream flow demands were used for each year of the <br />simulation. The file yampaT.ifa contains monthly demands for each instream flow structure included <br />in the Yampa Model. <br />Phase IIIa enhancements that impacted the instream demand file are the same as those described in <br />Section 4.4.1. Appendixes D.1 and D.12 describe these Phase HIa enhancements. <br />4.4.3 Instream Right File - yampaT.ifr <br />Water rights for each instream flow reach modeled in the Yampa River basin are contained in the <br />yampaT.ifr file. Table 4.4.3a summarizes the administration number and decreed amount for each <br />instream flow reach modeled. These data were obtained from the CRDSS database and correspond to <br />the State Engineer's official water rights tabulation. <br />Instream Flows 4 -16 <br />4.4 Instream Flows <br />' <br />Instream flows are described in the Yampa Model by three files: <br />4.4.1 Instream Station File <br />4.4.2 Instream Demand File <br />4.4.3 Instream Right File <br />4.4.1 Instream Station File - yampaT.isf <br />Table 4.4.1a shows the instream flow reaches included in the Yampa Model along with their location <br />and average annual demand based on decree amount. Section 4.4.2 describes how instream demands <br />were estimated. <br />Phase IIIa enhancements that impact the instream station file include replacing 73 instream flow <br />points with 15 instream flow reaches. This enhancement, which involved revising the StateMod <br />program, was implemented to satisfy instream flow decree requirements. Secondly, an instream <br />flow reach was added to the Yampa model on Dome Creek, a Bear River tributary that was newly <br />included under Phase IIIa. Appendixes D.1 and D.12 describe these Phase IIIa enhancements. <br />4.4.2 Instream Demand File- yampaT.ifa <br />Instream flow demands were developed from decreed amounts and comments in the state engineer's <br />water rights tabulation. Twelve monthly instream flow demands were used for each year of the <br />simulation. The file yampaT.ifa contains monthly demands for each instream flow structure included <br />in the Yampa Model. <br />Phase IIIa enhancements that impacted the instream demand file are the same as those described in <br />Section 4.4.1. Appendixes D.1 and D.12 describe these Phase HIa enhancements. <br />4.4.3 Instream Right File - yampaT.ifr <br />Water rights for each instream flow reach modeled in the Yampa River basin are contained in the <br />yampaT.ifr file. Table 4.4.3a summarizes the administration number and decreed amount for each <br />instream flow reach modeled. These data were obtained from the CRDSS database and correspond to <br />the State Engineer's official water rights tabulation. <br />Instream Flows 4 -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.