Overland Ditch and Reservoir Company <br />July 12, 2005 <br />Page 3 of 5 <br />Proiect Descriation <br />Agenda Item 6a <br />The purpose of this project is to store a conditional storage water right that will supply supplemental <br />irrigation water and the possibility of augmentation water in the future. Three alternatives have been <br />considered: <br />1. No action <br />2. Transfer of the storage right to another existing or potential reservoir location. <br />3. Provide additional storage capacity at the existing Overland Reservoir. <br />Alternative 3 was selected because failure to store the conditional water rights may soon result in the <br />loss of the right, and potential sites for expansion are problematic and expensive (over $5,500 per AF). <br />The project will involve elements needed to increase the normal water surFace elevation by about 3.8 ft. <br />_____ <br />Elements include the following: — <br />• Raising the main dam and auxiliary dam crest elevations by about 1.5 to 2.0 ft and adding rip <br />rap needed to protect the embankment below the completed normal water surface. <br />__ _ <br />• Upgrading the auxiliary dam to include internal and toe drainage, increasing the crest width, <br />adding rip rap as necessary to protect the embankment below the completed normal water <br />surface and adding embankment to the downstream slope to flatten it to a more moderate and <br />more stable slope. <br />• Raising the spillway crest level by 3.8 feet to allow for storage of the additional water. This will <br />be accomplished by increasing the height of the existing concrete weir wall as well as the <br />training and retaining walls. <br />Construction is expected to start in the summer of 2007. However, the construction schedule is highly <br />dependent on two considerations: <br />• NEPA Permit: The project is expected to start in the summer of 2007. The schedule is <br />dependent on the duration of the NEPA Permit process. In 1987, the dam rehabilitation work <br />required 17 months from initiating the permit until start of construction. If this NEPA process is <br />shorter it may be possible to start construction sometime in 2006. <br />• Elevation: Because the elevation of the project site is nearly 10,000 ft, the construction season <br />is very weather dependent and the maximum construction season is limited to May through <br />November. <br />Total Project cost estimate is: <br />Construction <br />Contingency (10% of Const. Est.) <br />Planning/Permitting/Engineering <br />Total <br />$950,380 <br />95,050 <br />209,120 <br />$1,254, 550 <br />Financial Analvsis <br />Table 1 shows a summary of the financial aspects of the Project for the current loan request. A CWCB <br />Loan of $1,130,000 will have an annual debt service obligation of $59,387 ($53,988 for annual loan <br />