My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:00:55 PM
Creation date
7/1/2010 2:57:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado River Endangered Fish
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/2004
Author
Bureau of Reclamation
Title
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Price -Stubb Fish Passage FONSI <br />"The Service anticipates incidental take of endangered fishes will be difficult to detect for <br />the following reasons: 1) finding a dead specimen is unlikely, 2) finding remains of <br />endangered fish in the stomachs of nonnative fish is unlikely because digestion makes <br />fish hard to identify, 3) documenting competition is difficult, and 4) fish sampling is <br />rarely conducted between the Government Highline Dam and Price -Stubb Dam. The <br />Service anticipates the amount of take to be small because the proposed fish passage <br />project will only allow nonnative fish access to approximately 3 miles of critical habitat." <br />The Service in its biological opinion issued an Incidental Take Statement and identified <br />reasonable and prudent measures necessary and appropriate to minimi take of Colorado <br />pikeminnow, razorback sucker, and bonytail. Reasonable and prudent measures included: <br />"The Bureau of Reclamation through the Recovery Program shall determine the number <br />and species of nonnative fishes moving upstream in the Colorado River above the Price - <br />Stubb Dam." <br />In order to be exempt from the prohibitions of section 9 of the Endangered Species Act, <br />Reclamation must comply with the following terms and conditions, which implement the <br />reasonable and prudent measure described above. The terms and conditions are nondiscretionary <br />and include: <br />1. "The Recovery Program shall monitor the numbers and species of nonnative fishes 0 <br />entering the future fish passage facility at the Government Highline Dam and provide <br />an annual report to the Service." <br />2. "The Recovery Program shall prevent farther upstream travel of nonnative fishes by <br />removing nonnative fishes from the river at the Government Highline Dam when the <br />fish passage facility, with selective passage, is completed." <br />Environmental Commitments <br />The Downstream Rock Fish Passage with Whitewater Features alternative will be constructed <br />based on the following conditions: <br />1) The Town of Palisade secures non - recovery program funding for the incremental <br />costs associated with the Downstream Rock Fish Passage with Whitewater Features. <br />2) The Town of Palisade obtains necessary permits from underlying landowners <br />(CDOT, E.R. Jacobson, and Palisade and Mesa County Irrigation Districts) for the <br />construction, operation, and maintenance of the whitewater features. <br />3) The Town of Palisade assumes ownership, liability, and maintenance responsibility <br />for the whitewater features. <br />4) The Town of Palisade obtains public access to the whitewater features from the <br />Union Pacific Railroad, E.R. Jacobson and CDOT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.