My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:00:55 PM
Creation date
7/1/2010 2:57:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado River Endangered Fish
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/2004
Author
Bureau of Reclamation
Title
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Price -Stubb Fish Passage FONSI <br />from affected land owners (Palisade and Mesa County Irrigation Districts, CDOT, E.R. <br />Jacobson, and the Union Pacific Railroad), 2) obtaining non - Recovery Program funding for <br />incremental recreation costs related increases over and above the Downstream Rock Fish <br />Passage Alternative, and 3) having a local governmental sponsor assuming liability, <br />maintenance, and obtaining public access downstream of the dam to the whitewater features. In <br />the event that any of the conditions are not met, Reclamation will construct the Downstream <br />Rock Fish Passage Alternative without recreation features. <br />Summary of Findings <br />Under the No Action Alternative, endangered fish passage upstream of the Price -Stubb <br />Diversion Dam will not be restored. This will not meet the purpose and need as described above. <br />Under the Selected Alternative, Reclamation will construct a fish passage that meets the <br />endangered fish needs and construct whitewater features for recreation while protecting existing <br />water rights. The incremental costs associated with the Downstream Rock Fish Passage with <br />Whitewater Features will be funded with Non - Recovery Program Funds. <br />In terms of environmental consequences associated with implementing the recommended <br />alternative; wildlife resources, Indian trust assets, and environmental justice will not be adversely <br />affected. 0 <br />Construction of the fish passage at the Price -Stubb Diversion Dam will have an adverse effect on <br />the historical properties of the Dam. The Dam is listed on the National Register of Historical <br />Places. A Memorandum of Agreement (MOA) between Reclamation and the Colorado State <br />Historic Preservation Officer identifies appropriate mitigation (HABS -HAER Documentation) <br />and methods to minimize impacts to the Dam's historical properties and was executed on June <br />29, 2004. The Advisory Council on Historic Preservation was notified of the adverse effect the <br />construction of the fish passage will have on the historic properties of the Price -Stubb Diversion <br />Dam. The Advisory Council elected not to participate in the MOU process. <br />The footprint of the Downstream Rock Fish Passage with Whitewater Features Alternative is <br />within the floodplain of the Colorado River other than the diversion itself, where there is a <br />negligible likelihood that cultural resources will occur. No archaeological resources were <br />identified during field surveys at the fish passage site, therefore it is predicted that that the <br />construction of a fish passage will have no effect on other cultural resources. <br />Construction activities will be limited to properties owned by Palisade and Mesa County <br />Irrigation Districts, E.R. Jacobson, and CDOT. Permits, easements, and access agreements will <br />be obtained from all affected parties to construct, operate and maintain the fish passage. Permit <br />conditions will be incorporated as environmental commitments. <br />Water quality may be negatively affected during construction; however impacts are projected to 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.