My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:00:55 PM
Creation date
7/1/2010 2:57:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado River Endangered Fish
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/2004
Author
Bureau of Reclamation
Title
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Environmental Assessment — Chapter 2— Alternatives <br />A cofferdam and or bypass channel may be used to direct the river around the • <br />construction area and river flows would not be reduced. Before construction, <br />Reclamation and the contractor would obtain necessary approvals required by the Clean <br />Water Act. Reclamation would request Section 404 authorization for the fish passage <br />under Regional General Permit No. 057 for projects that benefit recovery of endangered <br />fishes. A separate Section 404 authorization would likely be needed for construction of <br />the whitewater features. If discharging water for construction dewatering is needed, the <br />contractor would obtain a Section 402 permit. Reclamation would also coordinate <br />construction activities within the 100 -year floodplain with Mesa County. Construction <br />would be scheduled during low river conditions in the fall of 2005. <br />Reclamation estimates the total costs for dam removal to be between $1,900,000 and <br />$2,900,000 depending on mitigation measures selected for impacts to the Ute Water <br />pump plant. The cost includes all preconstruction activities, permitting, construction, <br />construction administration, and mitigation measures. <br />Operation and Maintenance <br />If the dam is removed to restore natural fish passage, no regularly scheduled actions <br />related to operation and maintenance is anticipated. The passage would operate as a <br />natural river channel, so maintenance would be minimal. <br />Water Supply 0 <br />pp Y <br />Because of downstream senior water rights, a flow of at least 520 cfs is present in this <br />reach of the river under all but the most severe drought conditions. The Service also has <br />up to 37,650 acre -feet of upstream reservoir storage water available for endangered fish <br />uses in drought years. Therefore, no measures would be needed to augment existing <br />water supplies to enable fish to swim upstream after dam removal. <br />Selection of Recommended Alternative <br />Reclamation has selected the Downstream Rock Fish Passage with Whitewater <br />Recreational Features Alternative as its recommended alternative contingent on <br />securing permits and easements from affected land owners, available non - Recovery <br />Program funding for the whitewater features, local governmental sponsorship to assume <br />liability, maintenance, and obtain public access for the whitewater features. Reclamation <br />and the Recovery Program believe this alternative would best meet project purposes <br />while protecting existing upstream uses and providing desired public safety and <br />recreation. The alternative also minimi the need for fish passage operation and <br />maintenance. <br />• <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.