My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:00:55 PM
Creation date
7/1/2010 2:57:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado River Endangered Fish
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/2004
Author
Bureau of Reclamation
Title
Price-Stubbs Fish Passage: Final Environmental Assessment, Finding of No Significant Impact
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Environmental Assessment — Chapter 2— Alternatives <br />to private and State properties, rights -of -ways, and facilities. Following construction, any <br />damaged area would be restored, as near as practicable, to its original condition. <br />Temporary construction access to the dam would be from an existing trail that lies within <br />the railroad right -of -way that parallels the railroad tracks and through E.R. Jacobson <br />property downstream of the dam. Construction staging and material storage would be on <br />adjacent vacant land owned by Eric Jacobson. <br />• <br />Figure 5- Public Service Company of New Mexico Diversion Dam Rock Fish Passage on the San Juan <br />River, New Mexico <br />Construction access and staging areas are limited near the dam because of its proximity to <br />the railroad tracks. However, because the fish passage would be located in the river <br />channel and not between the dam, head gates and railroad; construction access would be <br />less constricted when compared to the conventional fish ladder alternative. <br />A cofferdam and /or bypass channel may be used to direct the river around the <br />construction area and river flows would not be reduced. Before construction, <br />Reclamation and the contractor would obtain necessary approvals required by the Clean <br />Water Act. Reclamation would request Section 404 authorization under Regional <br />General Permit No. 057 for projects that benefit recovery of endangered fishes. If <br />discharging water for construction dewatering is needed, the contractor would obtain a <br />Section 402 permit. Reclamation would also coordinate construction activities within the <br />100 -year floodplain with Mesa County. Construction would be scheduled during low <br />river conditions in 2005. <br />The estimated construction cost for this alternative is approximately $4,800,000. Costs <br />for operations and maintenance for this alternative would be negligible. Recovery <br />Program cost for this alternative would be comparable to the Downstream Rock Fish <br />Passage with Whitewater Features Alternative. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.