Laserfiche WebLink
Price -Stubb Fish Passage FONSI <br />Page <br />The in- river portions of the fish passage and whitewater features will be constructed during low - <br />river flow periods between November 2005 and March 2006 to minimi impacts to downstream <br />water quality. Contract specifications will require construction contractors to use U.S. Army <br />Corp of Engineer approved cofferdams and/or other dewatering measures to minimize impacts to <br />downstream water quality. <br />Conclusions <br />Based on a review of comments received, analysis of environmental impacts, and coordination <br />with the Service under the Endangered Species Act, Reclamation concludes that implementation <br />of the recommended fish passage with implementation of the above described mitigation, will <br />not have significant impact on the quality of the human environment or the natural resources in <br />the project area. <br />This Finding of No Significant Impact has, therefore, been prepared and is submitted to <br />document environmental review and evaluation of the proposed action in compliance with the <br />National Environmental Policy Act of 1969, as amended. <br />Prepared By: <br />Terence L. Stroh - sunned 12121104 <br />Terence L. Stroh, General Biologist Date <br />Reviewed By: <br />Stephen K McCall - signed 12121104 <br />Stephen McCall, Environmental Protection Specialist Date <br />Approved By: <br />Carol DeAngelis - skned 12121104 <br />Carol DeAngelis, Area Manager Date <br />Western Colorado Area Office <br />• <br />