� <br />• � <br />Project Irnpacts <br />The enlargement project will increase storage volume of the reservoir by 11,750 acre-feet and <br />increase surface area from 435 acres to 720 acres at full pool. Approximately 37 acres of <br />jurisdictional wetlands will be inundated. Approximately 31.7 acres of the impacted wetlands <br />are in the area of sediment deposition created at the upper end of the existing reservoir. The <br />remainder are in sma11 isoiated areas along the shoreline of the existing reservoir and at the toe of <br />the existing dam. See the enclosed copy of the USACOE 404 permit and application for more <br />detail. I have included both as the application contains information not included in the permit. <br />Non-native game fish contained in Elkhead Reservoir aze being maintained at the request of the <br />Colorado Division of Wildlife by keeping a game fish mitigation pool in the reservoir during <br />construction. � <br />Moffat County Road 28 uses the dam crest to cross the Elkhead Creek valley. During <br />construction this road will not be available, so a temporary detour is being constructed across the <br />reservoir basin on the portion of County Road 78 which was inundated by the existing reservoir. <br />Elkhead Reservoir will be maintained at a reduced level during the construction period to � <br />accommoda.te this detour. , <br />The existing reservoir has ]imited recreational facilities consisting of a boat ramp, two ski <br />beaches, one swim beach, a primitive campground, an undefined camping area and 4 vault toilet <br />type restroom facilities. The recreational aspects o�the existing reservoir are operated by <br />_ .m. . <br />Colorado State l�arlcs (CSP� as part of the Yainpa ff`iver S'�afe Prark. Impacts to fihe exi��iii� �- <br />recreation facilities will be mitigated by the project. CSP has committed one million dollars to <br />make improvements to the recreation facilities during the construction period of the enlargement <br />project. Due to the extent of the enlargement project activities, the entire site will be closed to <br />public access during the enlargement project (December 2004 until Spring 2007). <br />Wetlands Mitigation <br />Wetlands mitigation for the ixnpacts rela�ed to the enlargement project is described in detail in <br />the attached USACOE 404 perniit and applieation. Wetlands mitigation includes creating 37.8 <br />acres of new wetlands in 4locations around the reservoir. These wetland mitigation areas are <br />depicted in the attached USACOE 404 permit. Th� mitigation plan is discussed in the peimit <br />application. The mitigation areas are distt-�buted around the reservoir in discrete locations <br />making them more ecoTogically functional than the isolated pockets surrounding the existing <br />reservoir. The sediment wedge wluch will accumulate at the upstream end of the new reservoir <br />will also create a wetlands area. The new upstream area will be enhanced and accelerated <br />through construction of sediment retention structures and by wetlands plantings. <br />One of the wetlands mitigation areas has been designed to support water fowl nesting activities. <br />While the lake and its margins provide a significant amount of water fowl habitat, nesting habitat <br />does not currently exist. Creation of new wetlands area which is disconnected from the reservoir <br />shoreline will facilitate the successful nesting of water fowl at the enlarged Elkhead Reservoir.. <br />