Laserfiche WebLink
. �. <br />• • <br />with the game fish mitigation pool in place to protect the game fishery. _ These measures include <br />tunneling the new outlet conduit into the partially full reservoir, construction of.the outlet works <br />tower behind a coffer dam in the partially full reservoir and screening of the construction <br />spillway and other construction water discharges from the reservoir. Our engineers have <br />provided a comparison of the construction effort with and without the provision of a gamefish <br />mitigation pool. This comparison has been used with the actual construction costs to determine <br />the cost of this mitigation measure. Costs of the permanent fish containment screens and a11 <br />related facilities are not part of this grant application. <br />The project has been granted a Clean Water Act Section 404 pernut by the U.S. Army Corps of <br />Engineers, No. 200375136, dated February 11, 2005, a copy of which is enclosed for your <br />reference. I have also included a copy of the 404 permit application as it discusses �in more detail <br />the impacts to the p�oject area and mitigation measures than the actual pernut. The description <br />of the project, the summary of impacts, estimated project costs, and estimated mitigation costs <br />are also included �or your informanox� and consideration. <br />We look forward to the Board's, the Division's, and the Coxnxnission's favorable consideration <br />of our mitigation efforts and our mitigation grant request: Please contact me with any questions <br />or comments you may have. I am available to meet with you, the Board, the Division or the <br />Commission as necessary. <br />Sincerely, <br />Ray D. Tenney, P.E. <br />Senior Water Resources Engineer <br />Enclosures: U.S. Army Corps of Engineers 404 Pexmit No. 200375I36 � <br />Application for U.S. Army Corps of Engineers 404 Permit No. 200375136 <br />Estimate of Costs Related to Construction with Game Fish Mitigation Pool <br />� Estimate of Costs through Completion for the General Dam Construction <br />M.J. Miller Construction - Schedule of Values for Mitigation Area 1VI1 <br />