My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Supply Part 4: Water Utilization Narrows Unit Draft
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Water Supply Part 4: Water Utilization Narrows Unit Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 3:34:25 PM
Creation date
6/29/2010 1:16:07 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Narrows Reservoir
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Title
Water Supply Part 4: Water Utilization Narrows Unit Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f urnished to water supply required is 1. I = . 96. Since farm <br />2.22 <br />production is closely rorreltted. with water supply, the ratio of <br />- oretent farm rroducti.on to future f =i - n production with C-.. full. <br />rater t3vprl.y should be apporo} tar tel r the saz e sc. prc,::;nt water <br />t to future water sunr.ly. In the 4rsr:lyriJ of ' .rra incor e., <br />the &ror val of _resent °_: roduction from irri -ted land. was <br />computed �-.e .$61.66 rer r pre �;, d tho arose v!>lae of f8ry production <br />:anger future conditions with a .full wt-ter e- vl'�.°�g. 7 e <br />rstio of the v?1ue under rrerent conditions to future: conditions <br />iC, $61.66 _ .S?. Thin agrees very well with the r• Aio of .96 com_— <br />7 .�._. 98 <br />;ruted on the b si* of water su:p and further su2:2tan.tia.tes the <br />vnIldity of the r,om- oixted water reauirewents used in the operation <br />stuelet% <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.