Laserfiche WebLink
EXAMPLE 5 <br />RELEASE FROM Clear Creek RESERVOIR TO Colorado Canal <br />Date of release: 9 -2 -73 Amount of release: 100 ft /s Duration of release: 5 days (120 hours) <br />Flow at Wellsville gaging station prior to release: 1,000 ft 3 /s <br />(Call 539 -6487 for stage, obtain discharge from table 2) <br />Time of travel (fig. 3): 36 hours <br />94 <br />TRANSPORTATION LOSSES <br />Bank storage (fig. 6) <br />1 <br />2 <br />3 <br />4 <br />5 <br />1 <br />Average <br />Bank storage <br />Time interval <br />Maximum time <br />Actual time <br />bank storage <br />in time interval <br />(hours) <br />in hours <br />in interval <br />in interval <br />(col. 3 x col. 4, <br />(hours) <br />(ft /s) <br />hours x ft /s) <br />0 -1 <br />1 <br />1 <br />100 <br />100 <br />1 -3 <br />2 <br />2 <br />50 <br />100 <br />3 -11 <br />8 <br />8 <br />30 <br />240 <br />11 -21 <br />10 <br />10 <br />20 <br />200 <br />21 -72 <br />51 <br />51 <br />10 <br />510 <br />72 -312 <br />240 <br />48 <br />5 <br />240 <br />312+ <br />- -- <br />- -- <br />70 <br />189 <br />Totals <br />1-3 <br />120 <br />100 <br />1,390 <br />Charge for <br />bank storage loss is 70 percent of <br />column 5 divided by <br />duration of release: <br />8.1 ft /s <br />Inadvertent diversions <br />8 <br />100 <br />3 <br />Charge for <br />inadvertent diversion losses (fig. <br />7): <br />59 <br />19.0 ft /s <br />Evaporation <br />10 <br />100 <br />20 <br />19.0 <br />Surface area increase (fig. 8): 40 acres <br />0 <br />39 <br />0.4 ft /s <br />Charge for <br />change in surface area (fig. 9): <br />100 <br />10 <br />19.0 <br />Charge for <br />change in river temperature (fig. <br />10): <br />71 <br />0 ft /s <br />TOTAL TRANSPORTATION LOSS----------------------------------------------- <br />-- --- ----------- - - -- -- 27.5 ft /s <br />TOTAL TRANSPORTATION LOSS (percent of <br />release) ------------------------------------------ - - - --- 27,5 <br />.4 <br />-- <br />DIVERSION SCHEDULES <br />76 <br />312+ <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 above-------------------------------------- - ----- - -- - - -- 76 ft /s <br />Release recession began at 0330 hours <br />Time interval from beginning Average divertible discharge <br />of recession (hours) (fig. 11, ft /s) <br />0 -4 58 <br />4 -8 31 <br />8 -12 12 <br />12 -16 3 <br />16 -22 p <br />22 -32 0 <br />M . <br />Prior to recession at Colorado Canal <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Average <br />Channel <br />Average <br />Time <br />Maximum time <br />Release <br />bank storage <br />Inadvertent <br />Evaporation <br />storage <br />Total <br />divertible <br />interval <br />in hours <br />discharge <br />(col. 4 above, <br />diversion <br />(ft /s) <br />(fig. 4, <br />(cols. 4 -7, <br />discharge <br />hours) <br />(ft /s) <br />ft /s) <br />(ft /s) <br />ft /s <br />ft /s) <br />(ft /s) <br />0 -1 <br />1 <br />100 <br />100 <br />1910 <br />0.4 <br />70 <br />189 <br />-- <br />1-3 <br />2 <br />100 <br />50 <br />19.0 <br />.4 <br />55 <br />124 <br />-- <br />3-11 <br />8 <br />100 <br />30 <br />19.0 <br />.4 <br />10 <br />59 <br />41 <br />11 -21 <br />10 <br />100 <br />20 <br />19.0 <br />.4 <br />0 <br />39 <br />61 <br />21 -72 <br />51 <br />100 <br />10 <br />19.0 <br />.4 <br />-- <br />29 <br />71 <br />72 -312 <br />240 <br />100 <br />5 <br />19.0 <br />.4 <br />-- <br />24 <br />76 <br />312+ <br />- -- <br />- -- <br />- -- <br />- - -- <br />Release arrived <br />at 1600 <br />hours <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 above-------------------------------------- - ----- - -- - - -- 76 ft /s <br />Release recession began at 0330 hours <br />Time interval from beginning Average divertible discharge <br />of recession (hours) (fig. 11, ft /s) <br />0 -4 58 <br />4 -8 31 <br />8 -12 12 <br />12 -16 3 <br />16 -22 p <br />22 -32 0 <br />M . <br />