Laserfiche WebLink
Date of release: 5 -19 -72 Amount of release: 450 ft /s Duration of release: 16 days (384 hours) <br />Flow at Wellsville gaging station prior to release: 800 ft /s <br />(Call 539 -6487 for stage, obtain discharge from table 2) <br />Time of travel (fig. 3): 4 hours <br />2 <br />Time interval <br />(hours) <br />Maximum time <br />in hours <br />0 -1 <br />1 -3 <br />3 -11 <br />11 -21 <br />21 -72 <br />72 -312 <br />312+ <br />Totals <br />EXAMPLE 3 <br />RELEASE FROM Twin Lakes RESERVOIR TO Colorado Canal <br />1 <br />2 <br />8 <br />10 <br />51 <br />240 <br />TRANSPORTATION LOSSES <br />Bank storage (fig. 6) <br />3 <br />Actual time <br />in interval <br />(hours) <br />1 <br />2 <br />8 <br />10 <br />51 <br />240 <br />72 <br />384 <br />4 <br />Average <br />bank storage <br />in interval <br />(ft /s) <br />500 <br />250 <br />135 <br />90 <br />50 <br />25 <br />10 <br />Charge for bank storage loss is 70 percent of column 5 divided by duration of release: <br />Inadvertent diversions <br />Charge for inadvertent diversion losses (fig. 7): <br />Evaporation <br />Surface area increase (fig. 8): 185 acres <br />5 <br />Bank storage <br />in time interval <br />(col. 3 x col. 4, <br />hours x ft /s) <br />500 <br />500 <br />1,080 <br />900 <br />2,550 <br />6,000 <br />720 <br />12,250 <br />22.3 ft /s <br />23.0 ft /s <br />0 � <br />Charge for change in surface area (fig. 9): 2.8 ft /s <br />Charge for change in river temperature (fig. 10): 0.5 ft /s <br />TOTAL TRANSPORTATION LOSS-------------------------------------------------- -------- --- -- -- ---- 48.6 ft 3 /s <br />TOTAL TRANSPORTATION LOSS (percent of release) ------------------------------------------ - - - - -- 10.8 <br />3Y DIVERSION SCHEDULES <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 above--------------------------------------------- - - - - -- 414 ft /s <br />Release recession began at 2300 hours <br />Time interval from beginning Average divertible discharge <br />of recession (hours) (fig. 11, ft /s) <br />0 -4 258 <br />4 =8 255 <br />8 -12 164 <br />12 -16 93 <br />16 -22 36 <br />22 -32 2 <br />34 <br />Prior` to recession at Colorado Canal <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Average <br />Channel <br />Average <br />Time <br />Maximum time <br />Release <br />bank storage <br />Inadvertent <br />Evaporation <br />storage <br />Total <br />divertible <br />interval <br />in hours <br />discharge <br />(col. 4 above, <br />diversion <br />(ft /s) <br />(fig. 4, <br />(cols. 4 -7, <br />discharge <br />hours) <br />(ft3 /s) <br />ft/s) <br />(f t /s) <br />ft /s <br />ft /s) <br />(ft /s) <br />0 -1 <br />1 <br />450 <br />500 <br />23.0 <br />3.3 <br />355 <br />881 <br />- -- <br />1-3 <br />2 <br />450 <br />250 <br />23.0 <br />3.3 <br />245 <br />521 <br />- -- <br />3-11 <br />8 <br />450 <br />135 <br />23.0 <br />3.3 <br />112 <br />273 <br />177 <br />11 -21 <br />10 <br />450 <br />90 <br />23.0 <br />3.3 <br />35 <br />151 <br />299 <br />21 -72 <br />51 <br />450 <br />50 <br />23.0 <br />3.3 <br />1 <br />77 <br />373 <br />72 -312 <br />240 <br />450 <br />25 <br />23.0 <br />3.3 <br />- -- <br />51 <br />399 <br />312+ <br />- -- <br />450 <br />10 <br />23.0 <br />3.3 <br />36 <br />414 <br />Release arrived <br />at 0200 <br />hours <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 above--------------------------------------------- - - - - -- 414 ft /s <br />Release recession began at 2300 hours <br />Time interval from beginning Average divertible discharge <br />of recession (hours) (fig. 11, ft /s) <br />0 -4 258 <br />4 =8 255 <br />8 -12 164 <br />12 -16 93 <br />16 -22 36 <br />22 -32 2 <br />34 <br />