My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Water Resources Circular No. 20
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Colorado Water Resources Circular No. 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 9:04:45 AM
Creation date
6/28/2010 4:21:51 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado Water Resources Circular No. 20, Transit Losses and Travel Times for Reservoir Releases, Upper Arkansas River Basin, Colorado
State
CO
KS
Basin
Arkansas
Water Division
2
Date
1/1/1973
Author
Russell K. Livingston, U.S. Geological Survey, Colorado Division of Water Resources: Office of the State Engineer, Southeastern Colorado Water Conservancy District
Title
Colorado Water Resources Circular No. 20, Transit Losses and Travel Times for Reservoir Releases, Upper Arkansas River Basin, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
During recession at Colorado Canal <br />Final divertible discharge from column 9 abov4 <br />Release recession began at 1100 hours <br />Time interval from beginning <br />of recession (hours) <br />0 -4 <br />4 -8 <br />8 -12 <br />12 -16 <br />16 -22 <br />22 -32 <br />Average divertible discharge <br />(fig. 11, ft /s) <br />379 <br />272 <br />178 <br />105 <br />44 <br />5 <br />436 ft /s <br />32 <br />EXAMPLE 1 <br />TRANSPORTATION LOSSES <br />r <br />RELEASE FROM Twin Lakes RESERVOIR TO Colorado Canal <br />Date of release: 5 -1 -68 <br />Amount of release: <br />500 ft /s Duration of release: _ __days (_ hours) <br />Flow at Wellsville gaging <br />station .prior to release: <br />400 ft /s <br />(Call 539 -6487 for stage, obtain discharge from <br />table 2) <br />Time of travel (fig. 3): <br />53 hours <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 abov4 <br />Release recession began at 1100 hours <br />Time interval from beginning <br />of recession (hours) <br />0 -4 <br />4 -8 <br />8 -12 <br />12 -16 <br />16 -22 <br />22 -32 <br />Average divertible discharge <br />(fig. 11, ft /s) <br />379 <br />272 <br />178 <br />105 <br />44 <br />5 <br />436 ft /s <br />32 <br />TRANSPORTATION LOSSES <br />Bank storage (fig. 6) <br />1 <br />2 <br />3 <br />4 <br />5 <br />Average <br />Bank storage <br />Time interval <br />Maximum time <br />Actual time <br />bank storage <br />in time interval <br />(hours) <br />in hours <br />in interval <br />in interval <br />(col. <br />3 x col. 4, <br />(hours) <br />(ft /s) <br />hours x ft /s) <br />0 -1 <br />1 <br />1 <br />705 <br />705 <br />1 -3 <br />2 <br />2 <br />355 <br />710 <br />3 -11 <br />8 <br />8 <br />190 <br />1,520 <br />11 -21 <br />10 <br />10 <br />125 <br />1,250 <br />21 -72 <br />51 <br />51 <br />70 <br />3,570 <br />72 -312 <br />240 <br />240 <br />35 <br />8,400 <br />312+ <br />- -- <br />24 <br />15 <br />360 <br />Totals <br />336 <br />16,515 <br />Charge for bank storage loss is 70 percent of <br />column 5 divided by duration of release: <br />34.4 ft /s <br />Inadvertent diversions <br />Charge for inadvertent diversion <br />losses (fig. <br />7): <br />45.0 ft /s <br />Evaporation <br />Surface area increase <br />(fig. 8): <br />280 acres <br />Charge for change in <br />surface area <br />(fig. 9): <br />4.2 ft /s <br />Charge for change in <br />river temperature <br />(fig. <br />10): <br />0 ft /s <br />TOTAL TRANSPORTATION LOSS------------------------------------- <br />--- -- - - - - -- <br />83.6 ft /s <br />TOTAL TRANSPORTATION LOSS <br />(percent of <br />release) ------------------------------------------ - - - - -- <br />16.7 <br />DIVERSION SCHEDULES <br />Prior to <br />recession at Colorado <br />Canal <br />1 2 <br />3 <br />4 <br />5 <br />6 7 <br />8 <br />9 <br />Average <br />Channel <br />Average <br />Time Maximum time <br />Release <br />bank storage <br />Inadvertent Evaporation storage <br />Total <br />divertible <br />interval in hours <br />discharge <br />(col. 4 above, <br />diversion <br />(ft /s) (fig. 4, <br />(cols. 4 -7, <br />discharge <br />( hours) <br />ft /s <br />ft /s) <br />(ft /s) <br />ft /s <br />ft /s) <br />(ft /s) <br />0 -1 1 <br />500 <br />705 <br />45.0 <br />4.2 395 <br />1,149 <br />- -- <br />1-3 2 <br />500 <br />355 <br />45.0 <br />4.2 275 <br />679 <br />- -- <br />3-11 8 <br />500 <br />190 <br />45.0 <br />4.2 125 <br />364 <br />136 <br />11 -21 10 <br />500 <br />125 <br />45.0 <br />4.2 40 <br />214 <br />286 <br />21 -72 51 <br />500 <br />70 <br />45.0 <br />4.2 2 <br />121 <br />379 <br />72 -312 240 <br />500 <br />35 <br />45.0 <br />4.2 - -- <br />84 <br />416 <br />312+ - -- <br />500 <br />15 <br />45.0 <br />4.2 - -- <br />64 <br />436 <br />Release arrived at 1500 <br />hours <br />During recession at Colorado Canal <br />Final divertible discharge from column 9 abov4 <br />Release recession began at 1100 hours <br />Time interval from beginning <br />of recession (hours) <br />0 -4 <br />4 -8 <br />8 -12 <br />12 -16 <br />16 -22 <br />22 -32 <br />Average divertible discharge <br />(fig. 11, ft /s) <br />379 <br />272 <br />178 <br />105 <br />44 <br />5 <br />436 ft /s <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.