Laserfiche WebLink
Table 4. - - Bank storage for reZeases from Twin Lakes Reservoir to CoZorado CanaZ <br />-Flora at Release Positive - Raite—of bank storage at indicated time <br />Wellsville discharge head change since release arrived at Colorado Canal <br />before release (in cubic in river, s <br />(in cubic feet per second)' <br />(' b i ' f f <br />in cu s eet eet per <br />.62 <br />514 <br />258 <br />138 <br />91 <br />53 <br />26 <br />per second) second) <br />(in feet) <br />2 hour <br />2 hours <br />7 hours <br />16 hours <br />2 days <br />8 days <br />400 500 <br />0.85 <br />705 <br />354 <br />189 <br />125 <br />72 <br />36 <br />400 <br />.72 <br />572 <br />287 <br />153 <br />102 <br />-59 <br />29 <br />300 <br />.57 <br />440 <br />221 <br />118 <br />78 <br />45 <br />23 <br />150 <br />.29 <br />240 <br />121 <br />65 <br />43 <br />25 <br />12 <br />50 <br />.10 <br />83 <br />42 <br />22 <br />15 <br />8 <br />4 <br />1,000 500 <br />.62 <br />514 <br />258 <br />138 <br />91 <br />53 <br />26 <br />400 <br />.45 <br />406 <br />204 <br />109 <br />72 <br />42 <br />21 <br />00 300 <br />.34 <br />282 <br />142 <br />76 <br />50 <br />29 <br />14 <br />150 <br />.18 <br />149 <br />75 <br />40 <br />26 <br />15 <br />8 <br />50 <br />.06 <br />50 <br />25 <br />13 <br />9 <br />5 <br />3 <br />2,500 500 <br />.39 <br />323 <br />162 <br />87 <br />57 <br />33 <br />17 <br />400 <br />.30 <br />249 <br />125 <br />67 <br />44 <br />25 <br />13 <br />300 <br />.20 <br />166 <br />83 <br />44 <br />29 <br />17 <br />9 <br />150 <br />.11 <br />91 <br />46 <br />24 <br />16 <br />9 <br />5 <br />50 <br />.04 <br />33 <br />17 <br />9 <br />6 <br />3 <br />2 <br />4 <br />