Laserfiche WebLink
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: Weldon Valley Ditch <br />Company, a Colorado nonprofit <br />corporation <br />�� <br />By �-,- <br />Ricky J. L r nzini, Pre dent <br />State of Colorado <br />Bill Ritter, Jr., Governor <br />B r <br />For the xecutive Director <br />Department of Natural Resources <br />Colorado Water Conservation �Board <br />Jennifer L. Gimbel, Director <br />(SEAL) <br />Attest � � <br />� � <br />By -�.-� : _ " .. � � <br />Eric R. Christensen, Secretary <br />- - � .. . -. . <br />'� � �. <br />: / ����' :f <br />� <br />� : �� . - <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods and/or <br />services provided. <br />David J. McDermott, CPA, State Controller <br />By � � - <br />Effective Date ��� c� � � <br />Loan Contract C150278 <br />Page 11 of 11 <br />