My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150276 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150276 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:25:01 PM
Creation date
6/28/2010 10:31:56 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150276
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Park
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sponsor: <br />Address: <br />Contact: <br />Telephone: <br />Fax: <br />E-mail: <br />Loan <br />Disb. No. <br />Date <br />Colorado Water Conservation Board <br />Project Expenditure Schedule <br />Tingel Reservoir Construction <br />Center of Colorado Water <br />Conserv. Dist Loan Contract No.: <br />P.O. Box 1747 Authorization: <br />Fairplay, CO 80440-1747 Contract Amount <br />Dan Drucker - Manager Loan Service Fee <br />303-838-0302 Total Loan Amount <br />Interest: <br />djd(a�mailstation.com Term: <br />_ Conditions: <br />Taac I.D. No.: <br />Substantial <br />Completion Date: <br />Description I Amount <br />Disbursed <br />1 3/2/2009 Desi n and Construction !$ 413,876.60 $ <br />� <br />Final ! 9/28/2009 Desi n and Construction ($ 36,123.40 $ <br />Fee ; 10/1/2009 1% Loan Service Fee t$ 4,500.00 $ <br />Ore. AccountinQ <br />C150276 <br />$454,500.00 <br />$450,000.00 <br />$4,500.00 <br />$454,500.00 <br />3.50% <br />10-years <br />Up to 90% <br />See File <br />10/ 1 /2009 <br />Cumulative Loan I Balance Available <br />Balance to Loan <br />� <br />413,876.60 '' $ <br />450.000.00 , $ <br />$ <br />Final Accountine <br />C150276 <br />$454,500.00 <br />$450,000.00 <br />$4,500.00 <br />$454,500.00 <br />3.50% <br />10-years <br />Up to 90% <br />See File <br />Contract <br />Interest <br />O 1/15/11 <br />Accrued <br />Interest <br />�.40 $ 8,453.29 $ 8,453.29 <br />i.00 $ 10.39 p $ 8,463.68 <br />- $ - � $ 8,463.68 <br />CenterofCobradoWaterC'onservancyDistrictC150276Exp-IDC.xIs TPF 10/26/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.