My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Limestone-Graveyard Creeks Watershed Plan and Environmental Assessment
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Limestone-Graveyard Creeks Watershed Plan and Environmental Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 1:36:13 PM
Creation date
6/25/2010 3:38:15 PM
Metadata
Fields
Template:
Water Supply Protection
Description
ARCA
State
CO
KS
Basin
Arkansas
Water Division
2
Date
9/1/1996
Author
Bent Soil Conservation District, Prowers Soil Conservation District, Colorado State Soil Conservation Board, Fort Lyon Canal Company
Title
Limestone-Graveyard Creeks Watershed Plan and Environmental Assessment
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� I <br />� I <br />I <br />J <br />7 <br />053- Draft Watershed Plan - Environmental Assessment <br />for <br />Limestone - Graveyard Creeks Watershed Project <br />Table of Contents <br />Contents: <br />ABSTRACT OF THE PLAN <br />WATERSHED AGREEMENT <br />SUMMARY OF DRAFT WATERSHED PLAN & ENVIRONMENTAL <br />ASSESSMENT <br />INTRODUCTION <br />PROJECT SETTING <br />WATERSHED PROBLEMS AND OPPORTUNITIES <br />SCOPE OF THE ENVIRONMENTAL ASSESSMENT <br />FORMULATION AND COMPARISON OF ALTERNATIVES <br />CONSULTATION AND PUBLIC PARTICIPATION <br />RECOMMENDED PLAN <br />Purpose and Summary <br />Measures to be Installed <br />Mitigation <br />Permits and Compliance <br />Costs <br />Installation and Financing <br />Operation, Management, and Replacement <br />REFERENCES <br />LIST OF PREPARERS <br />INDEX <br />GLOSSARY <br />page <br />ii <br />1 <br />8 <br />14 <br />20 <br />25 <br />38 <br />40 <br />40 <br />40 <br />41 <br />41 <br />41 <br />45 <br />47 <br />52 <br />61 <br />64 <br />66 <br />A -1 <br />B -1 <br />C -1 <br />D -1 <br />I xiii <br />Tables: <br />Table A LAND COVER <br />' <br />Table B CROPLAND DISTRIBUTION <br />Table C IDENTIFIED CONCERNS <br />' <br />Table D SUMMARY AND COMPARISON OF CANDIDATE PLANS <br />Table E Schedule of Obligations <br />Table 1 ESTIMATED INSTALLATION COST <br />Table 4 ESTIMATED AVERAGE ANNUAL NED COSTS <br />Table 5a Estimated Average Annual Watershed Protection <br />Damage Reduction Benefits <br />Table 6 Comparison of NED Benefits and Costs <br />Appendices: <br />' <br />Appendix A - Letters of Comments <br />Appendix B - Support Drawings /specifications <br />Appendix C - Investigations and Analyses <br />Appendix D - Project Map <br />page <br />ii <br />1 <br />8 <br />14 <br />20 <br />25 <br />38 <br />40 <br />40 <br />40 <br />41 <br />41 <br />41 <br />45 <br />47 <br />52 <br />61 <br />64 <br />66 <br />A -1 <br />B -1 <br />C -1 <br />D -1 <br />I xiii <br />
The URL can be used to link to this page
Your browser does not support the video tag.