My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150156 FS
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150156 FS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:59:35 AM
Creation date
6/24/2010 2:06:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150156
Contractor Name
Arkansas Groundwater Users Association
Contract Type
Loan
Water District
14
County
Pueblo
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />, <br />�.' <br />' <br />� <br />' <br />, <br />� <br />� <br />C <br />, <br />�I <br />' <br />' <br />' <br />9.0 FUNDING ANALYSIS <br />The cost to purchase 785 shares of the Excelsior Ditch Company at $1,100 per share is $863,500. The <br />engineering costs for the water rights appraisal and feasibility are estimated to be $20,000. An additional <br />$189,000 is estimated to be required for enlargement of the Excelsior Ditch and construction of a 15-acre <br />recharge pond including a 30 percent contingency and 15 percent design cost. AGUA is seeking a loan <br />from the CWCB Arkansas River augmentation loan account , ., fl� purchase 785 shares of the <br />Excelsior Ditch Company stock and complete the Excelsior Ditch construction projects as outlined <br />below. <br />TABLE 8 <br />Estimated Total Project Costs <br />Estimated Engineering Costs: <br />Feasibility Study — Tetra Tech RMC $15,000 <br />Appraisal — Blatchley Associates $5,000 <br />Estimated Total Engineering Costs $20,000 <br />Estimated Construction Costs: <br />Excelsior Ditch Enlargement $25,000 <br />Recharge Pond $81,000 <br />Structures $20,000 <br />30% Contingency $38,000 <br />15% Design Cost $25,000 <br />Estimated Total Construction Costs $189,000 <br />Estimated Ditch Share Purchase <br />Excelsior Ditch Shares $863,500 <br />Estimated Total Costs $1,072,500 <br />The estimated total project costs of $1,072,500 plus a one percent loan origination fee minus $5,000 <br />, from a CWCB Feasibility Study Grant results in total costs of $1,078,275. We understand that the <br />CWCB would offer AGUA a loan at 90 percent, resulting in a total loan amount of $970,448. The term <br />' and rate for the CWCB loan is requested to be 30 years at two and one-half percent. At this rate, annual <br />payments for the $970,448 loan would be $46,366. This amount does not include the 10 percent reserve <br />' required by the CWCB to be set aside for the first ten years of loan repayment. <br />' AGUA — 2003 Feasibility Study - 20 - August 15, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.