Laserfiche WebLink
AGUA — Water Rights Purchase/Recharge Project <br />September 22-23, 2003 <br />The Total Project cost is estimated to be as follows: <br />1. EIC Water Rights Purchase <br />2. Acquisition Costs <br />3. Recharge Construction/Ditch Enlargement <br />4. Recharge Design Costs <br />5. Loan Origination Fee (1%) <br />TOTAL <br />Financial Analvsis <br />$ 863,500 <br />20,000 <br />164,000 <br />25,000 <br />9.608 <br />$1,082,108 <br />Agenda Item 5c <br />The total estimated cost of the water rights purchase and recharge project is $1,082,108. AGUA <br />qualifies for a blended interest rate of 2.5%. Staff recommends that the Board consider a maximum <br />loan amount of $970,448 (89.7% of estimated project cost) for 30 years at an interest rate of 2.50%. <br />Table 1 is a summary of the financial aspects of the project. A CWCB Loan of $970,448 would have <br />an annual payment of $51,022 (including the 10% reserve requirement) at the loan terms of 2.50% <br />for 30 years. <br />Table 1. EIC Water Rights/Recharge Project Loan Financial Summary <br />Pro'ect Cost $1,082,108 <br />Number of Active Members ells — Varies 400 <br />Number of In-active Members ells — Varies 50 <br />CWCB Loan Amount 30 ears $970,448 <br />CWCB Loan Pa ment includes 10% reserve — Be in 2004 $51,022 <br />Member Fee er Well — 2003 $290 <br />Future Increase Loan Fee from $46 to $60 er well $304 <br />Aug. Water Loan Assessment Fee in 2003 -(per ac-ft of well depletion) $5.00 <br />Future, as needed $2.50 -7.50+ <br />Au . Water Cost to Members in 2003 - er ac-ft of well de letion $34-60 <br />Future, as needed $12-60 <br />Annual Loan Cost er ac-foot aver. Consum tive use 703 ac-ft. $72.58 <br />AGUA is proposing to repay the CWCB loans by raising its loan/acquisition-related fees. AGUA <br />plans on increasing the member loan fee (per well) from $46 to $60, and the loan assessment fee <br />(per acre-foot) of replacement water to $7.50, or more as needed. The Augmentation Water Cost to <br />rnembers would not relate directly to CWCB loan repayment, as these charges are "pass-though" <br />costs to members of AGUA's lease expenses to secure replacement. <br />Table 2 shows the Financial Ratios for AGUA and indicates average ability to repay the $970,448 <br />CWCB loan, with a new loan fee structure in place. The 2001 and 2002 ratios reflect annual <br />operating deficits of $52,475 and $42,117 respectively, and do not reflect the $100,000 Emergency <br />Drought grant from CWCB. The operating deficits can in large part be attributed to the high <br />engineering costs incurred those years of $49,500 in 2001 and $108,500 in 2002, where $25,000 per <br />year is more typical of normal operations. The large change in Debt Service Coverage Ratio from <br />2001 to 2002 can be attributed to the deferred $25,500 CWCB loan payment, which magnifies the <br />ratio calculated in the formula. <br />Page 6 of 9 <br />