My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes of South Platte River Basin Flood Control Investigation Meeting
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Minutes of South Platte River Basin Flood Control Investigation Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2010 3:25:17 PM
Creation date
6/23/2010 12:49:54 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Restudy South Platte River Survey: Flood Control
State
CO
Basin
South Platte
Water Division
1
Date
1/22/1959
Title
Letter to Felix L. Sparks Concerning Re-evaluation of Flood Control
Water Supply Pro - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH PLATTE RIVER BASIN FLOOD <br />CONTROL INVESTIGATION <br />Priority 1 Hydrologic studies currently under active investigation. <br />(Priority 1 has been given to Denver region.) <br />1. Hydrology. Item - Discharge probability analysis. <br />a. Status - Complete <br />Locations: <br />General - all USGS gaging stations in South Platte basin <br />pertinent to flood control investigation <br />Specific locations in Denver region priority 1 status: <br />1. Waterton gage. <br />2. Littleton gage. <br />3. Denver gage @ 19th Street. <br />4. Henderson gage. <br />5. Ft. Lupton gage. <br />6. Bear Creek - gage at mouth near Sheridan. <br />b. Status - Expected to be completed by July 1959 (Priority 1) <br />Locations: <br />(1) Clear Creek, at W. 44th Ave. bridge, Wheatridge. <br />(2 ) Little Dry Creek @ Broadway St. crossing just south of <br />Hampden Avenue in Englewood. <br />(3) Tollgate Creek: <br />a. At mouth ( confluence with Sand Creek). <br />b. At Colfax Ave. crossing, southeast of Fitzsimons. <br />Hosp. <br />(4) Sand Creek: <br />a. At mouth <br />b. At Commerce Town - Brighton Blvd. crossing. <br />c. Near Morris Bros. housing development north of <br />Fitzsimmons Hosp. <br />Note: Balance of discharge probability analyses in basin <br />under priorities 2, 3, 4 & 5 to be accomplished at <br />later date (32 locations). <br />2. Hydraulics. <br />Items under study under priority one: Channel capacities; <br />restrictive effect of structures; overbank flooding con- <br />ditions. <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.