My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150271 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150271 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:25:07 AM
Creation date
6/23/2010 8:27:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150271
Contractor Name
WRCC, Inc.
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br />Date: October 31, 2008 <br />Borrower: WRCC, Inc. <br />Principal Amount: $1,285,730 <br />Interest Rate: 2.55% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150271, dated October 31, 2008 <br />Loan Payment: $61,839.41 <br />Payment Initiation Date*: /• r a r�� �, �Z 0/ L7 <br />Maturity Date`: i�� r� li /,,� D�/U <br />* Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />1. FOR VALUE RECEIVED the BoRROwER promises to pay the Colorado Water Conservation Board <br />("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to the Loatv <br />CoNT�cT and this promissory note. <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from Payment Initiation Date (the date the CWCB dete�mines that the project <br />is substantially complete), and annually thereafter. All principal, interest, and late charges, if <br />any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br />3. Payments shall be rnade to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br />does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change the <br />amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />7. This Note is issued pursuant to the LoAN Co►vTw4cT between the CWCB and the BoRROwER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are evidenced <br />by a Security Agreement ("Security Instruments") of even date and amount and cover certain <br />revenues, real property, water rights and/or accounts of the BoRROwER. The Loarv CorvTw�cT <br />and Security Instruments grant additional rights to the CWCB, including the right to accelerate <br />the maturity of this Note in certain events. <br />8. If any annual payment is not paid when due or any default under the LoArv CorvT�►CT or the <br />Security Instruments securing this Note occurs, the CWCB may declare the entire outstanding <br />Appendix 2 to Loan Contract C150271 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.