My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150244 proj completion ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150244 proj completion ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2012 12:02:11 PM
Creation date
6/23/2010 8:25:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150244
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Colorado Water Conservation Board <br />Project Expenditure Schedule <br />Angel Lake Outlet Repair <br />Ore.Proi. Accounting <br />Final Project Accountine <br />Sponsor: <br />Wood Lake Mutual Water & Irrigation Co. Loan Contract No.: <br />C150244 <br />C150244 <br />Address: <br />P.O. Box 72 <br />Authorization: <br />$212,706.00 <br />$0.00 <br />Lucerne, CO 80646 Contract Amount <br />$210,600.00 <br />$86,254.03 <br />Contact: <br />Gary Booth, President Duane Smith, Engineer Loan Service Fee <br />$2,106.00 <br />$862.54 <br />Telephone: <br />970 - 490 -2620 <br />Smith Geotechnical Total Loan Amount <br />$212,706.00 <br />$87,116.57 <br />Fax: <br />970 -490 -2851 <br />Interest: <br />2.50% <br />2.50% <br />E -mail: <br />Term: <br />30 -years <br />30 -years <br />Conditions: <br />90% <br />90% <br />Tax I.D. No.: <br />On File <br />On File <br />Substantial <br />Completion Date: <br />6/1/2010 <br />Contract Expires: <br />7- Dec -09 <br />Balance <br />Loan Disb. <br />Amount <br />Cumulative Loan <br />Available to <br />Accrued <br />No. <br />Date <br />Description <br />Disbursed <br />Balance <br />Loan <br />Interest <br />Interest <br />$212,706.00 <br />1 <br />4/14/2008 <br />Engineering <br />$ 32,879.96 <br />$ <br />32,879.96 <br />$ 179,826.04 <br />$ 1,752.10 <br />$ 1,752.10 <br />2 <br />7/28/2009 <br />Engineering/Construction <br />$ 53,374.07 <br />$ <br />86,254.03 <br />$ 126,451.97 <br />$ 1,125.97 <br />$ 2,878.07 <br />Final <br />6/1/2010 <br />Loan Origination Fee <br />$ 862.54 <br />$ <br />87,116.57 <br />$ 125,589.43 <br />$ - <br />$ 2,878.07 <br />Final <br />6/1/2010 <br />Adjustment - PO Mod <br />$ (125,589.43)1 <br />$ <br />87,116.57 <br />$0.00 <br />1 $ - <br />I $ 2,878.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.