My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplements 1-3 of Views, Comments and Recommendations on narrows Dam Project
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Supplements 1-3 of Views, Comments and Recommendations on narrows Dam Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2010 12:44:20 PM
Creation date
6/22/2010 1:31:02 PM
Metadata
Fields
Template:
Water Supply Protection
State
CO
Basin
South Platte
Water Division
1
Date
12/19/1951
Author
Clifford Johnson
Title
Supplements 1-3 of Views, Comments and Recommendations on narrows Dam Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R E S O L U T I O N <br />WHEREAS, it has been proposed by the Buraan of Reclamation of the Depart <br />ment of the Interior of the Unit.a otates to build a reservoir near Fort gorgan, <br />('..toi•ado. ,+. ua%.%4_ _� fn:iovrn as the Narrows site, to have a total capacity of <br />1 acre feet, of which 250,000 acre feet would be for flood control ;and <br />THEREAS, the matter is being considered by the Colorado Conservation Board <br />with a view to making recommendations of behalf of Colorado respecting such <br />project, <br />NOU, THEREFORE, BE IT RESOLVED: <br />That said Board should represent the position of Colorado to be as follows: <br />1: From the stgr dppint of flood cAntro�, a 4Wben Rf email rpsprypirs <br />to control tributaries before damage is done should' be �49 ougY ly it vpstigated <br />as a substitute for the Marrows Reservoir. <br />2. Consideration should be given to moving the Narrows Reservoir 'tq a <br />nearby site fear construction pp a much smaller plan which wjll overcome damage <br />to the q#iting gconpmy which wg4 pq djsT goated by t #e Fps}$ r ruo#pn o f t h p <br />presently'proposed reservoir. <br />3. That this organization believes that priority should be given to the <br />Chatfield flood control project over the Narrows Reservoir project because said <br />former project will give upstream protection between its location and the <br />location of the Narrows Reservoir, and after its construction, experience may <br />demonstrate that is construction together with construction of other upstream <br />reservoirs will make it possible to greatly economize on the construction of a <br />reservoir at or near the Narrows site. <br />4. Construction of higher reservoirs will tend to benefit downstream <br />irrigation thus producing incidental benefits from the headwaters through the <br />entire length of the Platte River in Colorado, as well as gaining the benefit <br />of more complete flood control protection. <br />Robert F. Frantz <br />:ayor <br />ATTEST: <br />E. E. A <br />City Clerk <br />PASSED and ALA %i - - TED by the City Council of the City of Englewood, Colorado, <br />this 10th dc-V of December, A D. 1951 <br />' LLI11- i BODAN, JR, <br />'J i COLBLIff E. CUSIII14G <br />TfJU E. DAVIS <br />ROLL CALL <br />ROBERT F. FFAITTZ <br />B. B. !,RIGHT <br />C11ARLliL; GR;ZORY <br />JAIdES RAPP absent <br />JACK ROBBINS <br />HARRY .G. ? EIGAND <br />11 �;, E. AWNR§ON, City Clerk of the City of cinglewgod, Colorado, do here- <br />by certify that the foregoing RESOLUTION # a t�'ue apd Fp reef; GQI�Y Pf a Reso- <br />l;�tion :, -Ay and regularly adopted and approved by the City Council and the Maycr <br />of the, City of. Englqu ©od, .�'ol.crado,' on the 10th day of 1?ecember, A.D i.95:�. <br />E.E.Anderson <br />City ClerkClerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.