My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150266 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150266 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 9:51:36 AM
Creation date
6/17/2010 9:23:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150266
Contractor Name
Granby Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pledge of revenues backed by an assessment covenant. <br />SECTION 7- ADDITIONAL CONDITIONS 8� CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements. <br />SECTION 8- CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECT. <br />B. Th@ BORROWER and the Engineering ConsultanYs Agreements and the plans and <br />spec'rfrcations must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and speafications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as we(I as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this eantract, the BoRROwER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER Shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />t. The BoRROwER shall construct the PRO�ECT in accordance with the approved plans <br />and specifications. <br />J. Upon completion of the PRO�ECT construction, the BoRROwER shall provide as-built <br />drawings of the PRO�ECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br />the BoRROw�R shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PRO�ECt construction, the BoRROwER shall arrange a final <br />Appendix 1 to Loan Contract C150266 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.