Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />Apri126, 2010 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. George Fulton, President <br />Granby Ditch and Reservoir Company <br />P.O. Box 399 <br />Cedaredge, CO 81413 <br />Re: Contract Number C150266 — Granby No. 12 Reservoir Rehabilitarion Project <br />Dear Mr. Fulton: <br />Bill Ritter Jr. <br />Govemor <br />james B. Martin <br />DNR Executive <br />Director <br />Jennifer L. Gimbel <br />CWCB Director <br />This letter is to advise you that the work described in the above referenced Contract was substanrially completed as of <br />Mazch l, 2010. In accordance with the Coniract, you owed and paid $3,594.42 for interest during construction, as calculated on <br />the attached.spreadsheet. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $7,492.35 is <br />due on Mazch 1, 2011. A 1% loan service fee of $2,200.92 was added to your principal balance of $220,092.35, for a final loan <br />balance of $222,293.27. A principal reducrion, 1% loan service fee, and IDC payment of $65,887.69 was applied to your account <br />as of March 1, 2010 for a final loan balance of $160,000.00. As requested, an adjusiment of $32,226.73 has been subtracted from <br />your approved loan amount of $254,520.00, since these remaining funds will not be needed. Please see the attached Loan <br />Repayment Schedule. Vaughn McWilliams, our Contract Adminislrator, will be in contact to amend the Promissory Note. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Granby Ditch and Reservoir <br />Company on the successful complerion of this project. Please call if you have any questions regarding this matter or if we can be <br />of service to you in the future. <br />Tim Feehan, P.E. <br />Chief, Finance � <br />cc. John Redifer, CWCB Boazd Member <br />Water Supply Planning and Finance Secrion <br />Project file <br />Contract file <br />Contract Amount = $254,520.00 <br />Expended Amount = $160,000.00 <br />Flood Protection • Finance • Stream and Iake Protection <br />Water Supply Protecrion • Conservation and Drought Planning <br />