Laserfiche WebLink
RMWSD GALLERY WELL SYSTEM TIMELINE <br />FEB MAR APR MAY JUN JUL AUG SEP OCT 2007 <br />GRANT APPLICATIONS <br />DESIGN & <br />APPROVAL <br />ELECTRIC <br />UTILITY INSTALL <br />DRILL <br />W ELL <br />WATER <br />TESTS <br />PUMP <br />{NSTALL <br />TREATMENT <br />INSTALL <br />TEST & <br />CONNECT <br />DELIVERABLES <br />l. PRODUCTION WELL <br />2. WATER QUALITY TESTS <br />3. TREATMENT & PUMP SYSTEM DESIGN <br />4. CDPHE SYSTEM APPROVAL <br />5. THREE PHASE UTII,ITY POWER SUPPLY <br />6. WATER TREATMENT SYSTEM WITH CONTACT CHAMBER <br />