My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Applicant's Disclosures Pursuant to C.R.C.P. 26(a)(2) Case No. 02CW038
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Applicant's Disclosures Pursuant to C.R.C.P. 26(a)(2) Case No. 02CW038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2010 10:26:45 AM
Creation date
6/9/2010 12:22:13 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Gunnison RICD
State
CO
Basin
Gunnison
Water Division
4
Date
5/19/2003
Author
Cynthia F. Covell, Upper Gunnison River Water Conservancy District
Title
Applicant's Disclosures Pursuant to C.R.C.P. 26(a)(2) Case No. 02CW038
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1991 -1998 Boulder Greenways Coordinator <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordination, management, and implementation of a <br />comprehensive, state -of- the -art greenway system designed to link virtually every major area <br />of Boulder. The award - winning project includes over forty miles of greenways, bridges and <br />underpasses pocket parks, environmental presentation and restoration areas, and flood <br />capacity improvements. The project budget is over $1 million each year. <br />1987 -1989 Special Projects Manager <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordinating and managing a number of City projects along with <br />providing guidance and input for the preparation of city -wide master plans, annual <br />operating and capital budgets. and determination of recommended city policies. Worked <br />closely with the Citv Manager's office, City Attorney's office and the Parks, Planning, Open <br />Space, .and Public Works Departments in a cooperative way to complete each project. <br />Received the 1988 Boulder Employee Performance Bonus Award. <br />198 1989 Boulder Creek Project Coordinator <br />City of Boulder <br />Boulder, Colorado <br />Planned, coordinated, and managed $4 million stream corridor project through the Citv of <br />Boulder. This project won the 1986 Colorado Engineering Excellence Award, 1986 <br />Colorado Landscape Design Award, and the 1987 Best of Boulder Awards. The project <br />has been the subject of numerous articles in national magazines and at national conferences <br />and has been viewed as a state -of -the -art model for urban creek corridor projects by many <br />U.S. cities. <br />1981-1982 Assistant City Engineer <br />City of Glenwood Springs <br />Glenwood Springs, Colorado <br />Responsible for handling daily emergency problems with the city water system, organizing <br />daily activities, design of capital improvement projects, and supervision of city crews. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.