Laserfiche WebLink
Upper Gunnison River Water Conservancy District <br />Case No. 02CW038, District Court, Water Division No. 4 <br />dated June 1, 2000. <br />Ted — resume, expert report, deposition transcript, user surveys <br />Randy — resume, expert report, supplemental report, deposition transcript, documents <br />produced at deposition: colored charts depicting USGS gaged flow rates for 1975 2002; <br />Upper Gunnison – Uncompahgre Basin Phase 1 feasibility study prepared by HDR <br />Engineering May 1989; exhibit prepared by Slattery titled "Amount of Streamflow Allocated <br />to the proposed RICD Water Right "; slide presentation on the development of Transmountain <br />Diversion Projects; summary of "Colorado River System Consumptive Uses and Losses <br />Reports prepared by U.S. Bureau of Reclamation ". <br />Rick — resume, expert report, deposition transcript, documents produced at deposition: photos; <br />whitewater park engineering diagram (2 pages); Instream Flows for Recreation: A Handbook <br />on Concepts and Research Methods 1993; CWCB 26(a)(2) in 98CW448; Clear Creek <br />Whitewater Park Golden, Colorado Preliminary Flow Assessment for Recreation by Shelby <br />and Whittaker Jan. 26, 2001; Clear Creek Whitewater Park Golden, Colorado Preliminary <br />Flow Assessment for Recreation by Shelby and Whittaker Jan. 26, 2001; Draft paper on the <br />Design and Construction of Artificial Canoe Slalom Courses by Goodman and Parr April <br />1989; CWCB RICD Rules; 11 -8 -01; CWCB RICD Policy 11- 19 -01. <br />CDSS data for Gunnison River on 3 CD -Roms. <br />Upper Gunnison – Uncompahgre Basin Phase 1 feasibility study prepared by HDR <br />Engineering May 1989 <br />Application for water rights Case no. 03CW49 <br />21 <br />