Laserfiche WebLink
Upper Gunnison River Water Conservancy District <br />Case No. 02CW038, District Court, Water Division No. 4 <br />12. Wet Year Flows entering the Whitewater Park (Figure 2 of July 21, 2003 Slattery <br />report). <br />13. Estimated Calling Water Right for the Upper Gunnison River Basin (Figure 3 of July <br />21, 2003 Slattery report). <br />14. Comparison of Streamflows - Gunnison River versus Clear Creek (Figure 4 of July <br />21, 2003 Slattery report). <br />15. Amount of Streamflow Allocated to the Proposed RICD Water Right (presented by <br />Jim Slattery at the September 10, 2002 CWCB hearing) (to be revised to reflect final CWCB <br />recommendation). <br />16. Comparison of Recommended RICD Flows (presented by Jim Slattery at the <br />September 10, 2002 CWCB hearing) (to be revised to reflect final CWCB recommendation). <br />17. Options for Recreation Instream Flow Filing (prepared by Jim Slattery.) <br />18. Table depicting results of CRDSS runs (produced by Randy Seaholm). <br />19. Table depicting results of CRDSS runs, with additional columns and/or corrections <br />prepared by Jim Slattery. <br />20. Graphs depicting results of CRDSS runs (produced by Randy Seaholm). <br />21. Records of Year 2003 Measurement of Flows Entering Whitewater Park. (This <br />exhibit may consist of several sub - parts). <br />22. Resume of Gary Lacy, P.E. <br />23. Letter Report dated July 3, 2002 by Gary Lacy, Resource Engineering and Planning. <br />(Attachments will be included as separate exhibits.) <br />24. Report for the Gunnison River Whitewater Park, May 17, 2003, by Gary Lacy, <br />Resource Engineering and Planning. <br />25. List of Completed Proj ects by Gary Lacy (Appendix 2 of May 17, 2003 Lacy report). <br />26. Layout of the Proposed Course (Appendix 3 of May 17, 2003 Lacy report). <br />27. As built survey ofportions of The Gunnison Whitewater Course (Appendix 4 ofMay <br />15 <br />