Laserfiche WebLink
4 <br /> 1 rado into another river basin for delivery or storage, <br /> 2 except as provided in this Act; <br /> 3 (4) impair or otherwise interfere with Contract <br /> 4 Nos. 00XX6C0049 and 0009D6C0048 between the <br /> 5 Board of Water Works of Pueblo, Colorado, and the <br /> 6 United States, or the renewal of Contract Nos. <br /> 7 00XX6C0049 and 0009D6C0048 pursuant to the <br /> 8 authority that provides the legal basis therefor; or <br /> 9 (5) affect the interpretation or implementation <br /> 10 of existing law or legislation for any other congres- <br /> 11 sionally authorized water project. <br /> 12 SEC. 2. SECRETARY AUTHORIZED TO CONDUCT STUDIES <br /> 13 FOR THE ENLARGEMENT OF PUEBLO DAM <br /> 14 AND SUGAR LOAF DAM. <br /> 15 (a) The Secretary of the Interior is hereby authorized <br /> 16 to engage in storage space studies, up to and including • <br /> 17 a feasibility study pursuant to section 8 of the Federal <br /> 18 Water Project Recreation Act (16 U.S.C. 4601 -19) and <br /> 19 section 9(a) of the Act of August 4, 1939 (Chapter 418; <br /> 20 43 U.S.C. 485h(a)), as may be appropriate, relating to <br /> 21 enlarging Pueblo Dam and Reservoir and Sugar Loaf <br /> 22 Dam and Turquoise Lake, Fryingpan - Arkansas Project, <br /> 23 Colorado, including studies for the purpose of determining <br /> 24 the potential costs, benefits, and environmental and rec- <br /> 25 reational impacts of such enlargements and the use and <br /> •HR 3881 IH <br />