My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
H.R.3881: A Bill
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
H.R.3881: A Bill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 9:03:21 AM
Creation date
6/3/2010 1:42:06 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Briefing Papers H.R. 3881
State
CO
Basin
Arkansas
Water Division
2
Date
3/6/2002
Author
107th Congress, 2nd Session
Title
H.R.3881: A Bill
Water Supply Pro - Doc Type
Legislation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 <br /> 1 the requirements of the Fryingpan- Arkansas Project, Col - <br /> 2 orado, for the impounding, storage, and carriage of non - <br /> 3 project water for domestic, municipal, industrial, and <br /> 4 other beneficial purposes: Provided, however, That such <br /> 5 contracts shall not impair or otherwise interfere with - <br /> 6 "(1) the project's authorized purposes, <br /> 7 "(2) the ability of the project contractors to <br /> 8 meet existing Federal repayment obligations, <br /> 9 "(3) the storage allocations and limitations pur- <br /> 10 suant to Contract No. 5- 07- 70– W0086, as amend - <br /> 11 ed, between the Southeastern Colorado Water Con- <br /> 12 servancy District and the United States, and the al- <br /> 13 location principles adopted by the Southeastern Col - <br /> 14 orado Water Conservancy District on November 29, <br /> 15 1979, and confirmed by the District Court of Pueblo <br /> 16 County in Civil Action No. 40487 by decree dated <br /> 17 December 18, 1979, including any subsequent modi- <br /> 18 fications made by the District that are confirmed by <br /> 19 the District Court, <br /> 20 "(4) the yield of the project from its West Slope <br /> 21 and East Slope water rights, or <br /> 22 "(5) the capacity in Reclamation project facili- <br /> 23 ties which is needed to satisfy project purposes and <br /> 24 contractual obligations with a term exceeding one <br /> 25 year, not including any contract executed pursuant <br /> •HR 3881 IH <br />
The URL can be used to link to this page
Your browser does not support the video tag.