My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOA of Southern Colorado Water Activity Enterprise and Town of Olney Springs
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
MOA of Southern Colorado Water Activity Enterprise and Town of Olney Springs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 9:03:24 AM
Creation date
6/3/2010 1:37:14 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Pueblo and Torquoise Reservoirs
State
CO
Basin
Arkansas
Water Division
2
Date
6/12/2001
Author
Southeastern Colorado Water Activity Enterprise, Town of Olney Springs, Steve Arveschoug, Deborah DeVor
Title
MOA of Southern Colorado Water Activity Enterprise and Town of Olney Springs
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REOPERATIONS MOA <br /> EAST OF PUEBLO <br /> G. The Reoperations component of the PSOP (as described in the PSOP Report) is <br /> designed to make up to a.f. storage space for non - Project water <br /> available to Participant. The availability of Reoperation Storage space to <br /> Participant ultimately will depend on the United States' execution of a <br /> Reoperation Contract with Participant. Participant's non - Project water stored in <br /> Reoperation Storage will remain subject to spill as provided in the District's <br /> Contract with the United States, Contract No. 5- 07- 70- W0086, Article 13, i.e., to <br /> spill after spilling of any Winter Storage Water in excess of 70,000 acre -feet, but <br /> prior to spill of Winter Storage Water not in excess of 70,000 acre -feet, and prior <br /> to any spill of East Slope Project Water. (A copy of said Article 13 is attached <br /> hereto as Exhibit A.) Non - Project water in Reoperation Storage is included <br /> within the maximum of 163,000 acre -feet of non - Project municipal contract water <br /> storage pursuant to the fourth spill priority. All water stored pursuant to <br /> in- District municipal contracts within the fourth spill priority, including water in <br /> Reoperation Storage, shall be spilled on a pro -rata basis when a spill of such water <br /> is necessary. <br /> H. The Fryingpan- Arkansas Project ( "Project") Operating Principles and Allocation <br /> Principles shall govern the use of Reoperation Storage to assure that the <br /> contracting, use and operations of Reoperation Storage shall not impair or <br /> otherwise interfere with: <br /> 1. the Project's authorized purposes; <br /> 2. the ability of the Project contractors (including the District) to meet <br /> existing repayment obligations; <br /> 3. the storage allocations and limitations pursuant to Contract No. <br /> 5- 07- 70- W0086, as amended, between the District and the United States, <br /> and the District's Allocation Principles; <br /> 4. the yield of the Project from its West Slope and East Slope water rights; or <br /> 5. the capacity in Project facilities, including the south outlet works capacity <br /> for the Arkansas Valley Pipeline, which is needed to satisfy Project <br /> purposes and contractual obligations with a term exceeding one year <br /> existing at the time of the execution of any Reoperation Contract pursuant <br /> to this MOA. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.