Laserfiche WebLink
REOPERATIONS MOA <br /> EAST OF PUEBLO <br /> G. The Reoperations component of the PSOP (as described in the PSOP Report) is <br /> designed to make up to j 0 0 0 a.f. storage space for non - Project water <br /> available to Participant. The availability of Reoperation Storage space to <br /> Participant ultimately will depend on the United States' execution of a <br /> Reoperation Contract with Participant. Participant's non - Project water stored in <br /> Reoperation Storage will remain subject to spill as provided in the District's <br /> Contract with the United States, Contract No. 5- 07- 70- W0086, Article 13, i.e., to <br /> spill after spilling of any Winter Storage Water in excess of 70,000 acre -feet, but <br /> prior to spill of Winter Storage Water not in excess of 70,000 acre -feet, and prior <br /> to any spill of East Slope Project Water. (A copy of said Article 13 is attached <br /> hereto as Exhibit A.) Non - Project water in Reoperation Storage is included <br /> within the maximum of 163,000 acre -feet of non - Project municipal contract water <br /> storage pursuant to the fourth spill priority. All water stored pursuant to <br /> in- District municipal contracts within the fourth spill priority, including water in <br /> Reoperation Storage, shall be spilled on a pro -rata basis when a spill of such water <br /> is necessary. <br /> H. The Fryingpan- Arkansas Project ( "Project ") Operating Principles and Allocation <br /> Principles shall govern the use of Reoperation Storage to assure that the <br /> contracting, use and operations of Reoperation Storage shall not impair or <br /> otherwise interfere with: <br /> 1. the Project's authorized purposes; <br /> 2. the ability of the Project contractors (including the District) to meet <br /> existing repayment obligations; <br /> 3. the storage allocations and limitations pursuant to Contract No. <br /> 5- 07- 70- W0086, as amended, between the District and the United States, <br /> and the District's Allocation Principles; <br /> 4. the yield of the Project from its West Slope and East Slope water rights; or <br /> 5. the capacity in Project facilities, including the south outlet works capacity <br /> for the Arkansas Valley Pipeline, which is needed to satisfy Project <br /> purposes and contractual obligations with a term exceeding one year <br /> existing at the time of the execution of any Reoperation Contract pursuant <br /> to this MOA. <br /> -4- <br />