Chatfield Reallocation Study: Meeting Minutes 12/7/04
Date
12/7/2004
Prepared For
Jefferson County / Arapahoe County
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 3- <br /> <br />. Possibly this contract between the CWCB and a water users would have an "Exhibit B" that <br />demonstrates this financial ability. <br />. Water Users agreed that the Study Planning Costs are dynamic and are flexible. Most agreed that <br />if language like "water users will cost share for $25-$40/Acre-Foot for their requested portion of <br />storage space" was put in the agreement it would give the CWCB and the Corps some wiggle <br />room but cap their portion of the shared costs. (Water User contributions based on this figure will <br />be at a minimum $515,000 and at a maximum of $824,000 to assist with non-federal partner cost <br />share to finish the study). <br />. Jeff Garami of the Town of Castle Rock requested a project balance sheet to give to his boards and <br />commissions to make approval easier. Larry Lang agreed that the CWCB and the Corps need to <br />produce a document that shows what the state and federal governments have spent, their best <br />estimate and total project costs, and the % complete of the total remaining tasks and a revised <br />timeline. <br />. Water Users discussed the idea of sub leasing agreements needing to go through CWCB Board <br />Member approval. <br /> <br />..8.L~:JLi:~~~~~1~~,;!Li~t~~lLL,;{1~~li~L!E:~~utli~IL~:L~LLlLQJ1~li~~:~~U~Li:ti~LL~2Jl~:~Ul~:~~:i~11r2..LLtli~Llii~lLL~2L~i~~2Inllli~I1It <br />iL&bLLtyL~~~;tlLI~~jJ};.LI~..tLLi:~L~;tLS~~~;tEEniL!rLtllLL~KU:~:EE:XLLitL{L~h:iL1~:.~.L~.1E:,,~Y~lll&LILg:L~~ <br /> <br />2l112..~:i~llHnitL~:l:..i~IEliL,-J~ii2~~uh:ti~L..i2lEL;'..u,:~11l.JLi211i:jILLtL~:lk:iLilL..d12..llgi:~Jll:i:iL'?J~il..l:!nLtiLh.ilnu~Lt <br /> <br />steve. caa n @ sta t eoco. 13 S 1~~L..i~LiL~i:....i2.L..t?i1~illt~;.~~t~...s2XLI?..i:~~i:.Illt~.:a~....L:L..Z~~tL~:L..~~:H.1L..11u:tL..S.~tl~UU~~~:~....i?.L <br /> <br />.i:i~llHILQlllLt . <br /> <br />. Water Users are supposed to submit an accounting spreadsheet report that will be input for the <br />Corps Reservoir routing model. A report from Rick McLoud was that all water users but two of <br />them have submitted their spreadsheets for inflow, storage and releases. <br /> <br />Final Water Users Subcommittee Meeting will be January 4th 2005. It will be held at the Denver Water <br />Board Room on the third floor and will run from 9:00 AM - 11 :30 AM. <br /> <br />The next overall Chatfield Reservoir Reallocation Study Proiect Meeting will be January 12,2005, at <br />10:00 AM at the Tetra Tech offices in Lakewood. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />