My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150308 feas study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150308 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:16:22 PM
Creation date
5/20/2010 9:38:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150308
Contractor Name
Parkville Water District
Contract Type
Loan
County
Lake
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Expected <br />Minimize Reliable <br />Project Environmental & Freezing Future <br />Alternative Descri tions Bud et Sociallm act Problems O erations <br />No Action No Structural - Moderate No Low <br />Modifications <br />Alternative Pump Station $2,520,000 Minimal Yes High <br />No. 1 & Pipe to <br />Evans Gulch <br />Alternative Pump Station $2,820,000 Moderate Moderate High <br />No. 2 & Pipe to <br />Existing <br />Canterbury <br />Wet Well <br />Wheeler recommends that the District consider immediate implementation of Alternative <br />No. 1 because, if initiated during mid July 2010, it could be completed by the end of <br />November 2010 and this alternative would result in a repair that would allow more <br />reliable operation of the distribution system during the following winter and for the future. <br />With a total budget of $2,520,000, the District has documented it is capable of funding <br />$700,000 of the total project budget with grant funds it has obtained. The remaining <br />$1,820,000 would be financed through a CWCB loan of 4 percent over a 30-year <br />repayment period, amounting to an annual repayment requirement of $105,251. A <br />financial plan prepared as part of this report documents that the District can repay the <br />annual loan payment based on its current rate structure during the 30-year life of the <br />loan. <br />_J W. (U. Ulheelsr and Associot¢s, Ine 5/19/2010 Final <br />—� Wotmr Rssouress Enginsars Page ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.