Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax:(303)866-4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Kirk Russell, PE Yy'' <br />Tirn Feehan, PE, Chief <br />Finance Section <br />DATE: May 1 l, 2010 (UPDATED MAY 19, 2010) <br />SUBJECT: Agenda Item 14c May 18-19, 2010 Board Meeting <br />Finance Section — New Project Loans <br />Parkville Water District — Canterbury Tunnel Repair <br />Introduction <br />Bill Ritter, Jr. <br />Governor <br />Mike King <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />The Parkville Water District (District) is applying for a loan for the Canterbury Tunnel Repair <br />Project (Project). The Project includes the construction of a vertical bore, installation of a well <br />pump station and 1.5 miles of 12 inch pipeline. The total design and construction cost estimate for <br />the Project is $2,520,000. The Project will allow the District to access water from the Canterbury <br />Tunnel which provided a high quality and reliable water supply until the late 1990's. The loan <br />request is for approximately 70% of the total Project cost. The District has received a$500,000 <br />grant from the Colorado Department of Local Affairs (DOLA) and a$200,000 grant from the <br />California Gulch/LTpper Arkansas River Superfund Program. See attached Project Data Sheet for a <br />location map and Project summary. <br />Staff Recommendation (Board approval on May 18, 2010 with added Contract Condition) <br />Staff recommends the Board approve a loan not to exceed $1,838,200 ($1,820,000 for project costs <br />and $18,200 for the 1% Loan Service Fee) to the Parkville Water District for the Canterbury Tunnel <br />Repair Project from the CWCB Construction Fund. The loan terms shall be the Low-Income <br />Municipal interest rate of 4.0% per annum for 30 years. Security for the loan shall be in compliance <br />with CWCB Financial Policy #5. <br />Contract Condition — District shall receive approval by the Division of Water Resources of a <br />Substitute Water Supply Plan for the proposed well prior to disbursements of loan funds. <br />lnterstate & Federal • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Finance <br />Water Information • Water Conservation & Drought Planning • Water Supply Planning <br />