. :. � -• .
<br />� � , . _
<br />2. Convey or cause title to be conveyed by deed or other proper
<br />conveyance to the Golorado Water Conservation Board, Department •
<br />Natural Resources, State of Colorado, the following portions� of th� -
<br />proposed project facilities: �
<br />. . . . . . . .. . . . ., k
<br />' a. A 12,030 foot concrete-lined section, having an average
<br />� bottom width of 4 feet, of the Sangre de Cristo-Trinchera i
<br />' , Diversion Canal, with all r.ecessary appurtenances. � r
<br />,, b. A 5,940�foot concrete-lined section, having an average
<br />bot�om width of �1 foot, of the Labato Lateral and the Labato:
<br />Extension, with all necessary appurtenances.
<br />: c.�. A 1,104 foot cancrete-lined section, ha�ling an average
<br />bottom width of l foot, of the Whitehead-Escheman Lateral,
<br />with all necessary appurte:�ances.
<br />. d. A 6,600 foot coilcrete-lined section, having an aver�ge
<br />. � bottom width�of 2 feet, of the Bean Lateral and the Middl�e
<br />Bean Lareral, with all necessary appurten�.nces.
<br />e. An 8,077 foot concrete-lined section, having an average
<br />,bottom.width of 2 feet, of the Newton Canal, with all nec�sary
<br />appurtenances. . �
<br />. ;
<br />f. A 2,648 foot concrete-lined section, having an average
<br />bottom width of l.5 fee , he Grimwood-Smith Lateral, caith �
<br />all necessary appur
<br />.: g. P. 2,937 foot concrete- ' ction, having an�a'verage
<br />bottom width of e f �rland Canal, with all
<br />nec:essary appurte s� pproximate locations of the
<br />� above are shown ppendix A.)
<br />3. Permit periodic inspection of construction by the a,uthoriz.ed
<br />representatives of the State during construction and permit the State ''.
<br />to review and approve or disapprove any eontracts �for the constru�tion;
<br />of the project or the performance of work pursuant to such contracts,
<br />or subcontracts. '
<br />4. Without expense to the State, manage, operate, and maintain •
<br />the project system continuously in an efficient and economical znanner,:
<br />and assume all legal liability for such management, oper.ation, and
<br />maintenance. F
<br />,
<br />�5. Make the services of said project available within its capacit;;r
<br />to all persons in the Contractor's service area without discrimination; '
<br />as to race, color; religion, or natural origin at reasonable charges, :
<br />including assessments, taxes,�or fees in accordance with a schedule
<br />of such charges, whether for one or more classes of service, formally '.
<br />adopted�by the Contractor through its board of directors, as may be
<br />modified from time to time by the Contractor. The initial rate
<br />schedule must be approved by the State. Thereafter, the Contractor �
<br />n�ay make such modifications to the rate schedule as the Contractor
<br />deems necessary to efficiently and economically provide for the finan-':
<br />cial requirements of the system as long as the rate schedule remains
<br />reasonable and non-discriminatory, and subject to the approval by the '
<br />State.
<br />6. Adjust its operating costs and service charge� from time to '
<br />time to provide for-adequate operation and maintenance, emergency
<br />repair seryices, obsolescence reserves, debt servic�, and debt '
<br />reserves.
<br />7. Expand the system from time to time to meet reasonable growth:
<br />or service requirements in the area within its jurisdiction. ,
<br />8. Provide the State with such periodic reports as it may require�
<br />and permit periodic inspections of its operations and accounts by a
<br />designated representative of the State. The Colorado Water Conserva-+
<br />tion Board, its agents, and employees, is hereby designated as the
<br />agent of the State for the purposes of this contract.
<br />;
<br />Page 2 of 5 pages
<br />
|