Laserfiche WebLink
. :. � -• . <br />� � , . _ <br />2. Convey or cause title to be conveyed by deed or other proper <br />conveyance to the Golorado Water Conservation Board, Department • <br />Natural Resources, State of Colorado, the following portions� of th� - <br />proposed project facilities: � <br />. . . . . . . .. . . . ., k <br />' a. A 12,030 foot concrete-lined section, having an average <br />� bottom width of 4 feet, of the Sangre de Cristo-Trinchera i <br />' , Diversion Canal, with all r.ecessary appurtenances. � r <br />,, b. A 5,940�foot concrete-lined section, having an average <br />bot�om width of �1 foot, of the Labato Lateral and the Labato: <br />Extension, with all necessary appurtenances. <br />: c.�. A 1,104 foot cancrete-lined section, ha�ling an average <br />bottom width of l foot, of the Whitehead-Escheman Lateral, <br />with all necessary appurte:�ances. <br />. d. A 6,600 foot coilcrete-lined section, having an aver�ge <br />. � bottom width�of 2 feet, of the Bean Lateral and the Middl�e <br />Bean Lareral, with all necessary appurten�.nces. <br />e. An 8,077 foot concrete-lined section, having an average <br />,bottom.width of 2 feet, of the Newton Canal, with all nec�sary <br />appurtenances. . � <br />. ; <br />f. A 2,648 foot concrete-lined section, having an average <br />bottom width of l.5 fee , he Grimwood-Smith Lateral, caith � <br />all necessary appur <br />.: g. P. 2,937 foot concrete- ' ction, having an�a'verage <br />bottom width of e f �rland Canal, with all <br />nec:essary appurte s� pproximate locations of the <br />� above are shown ppendix A.) <br />3. Permit periodic inspection of construction by the a,uthoriz.ed <br />representatives of the State during construction and permit the State ''. <br />to review and approve or disapprove any eontracts �for the constru�tion; <br />of the project or the performance of work pursuant to such contracts, <br />or subcontracts. ' <br />4. Without expense to the State, manage, operate, and maintain • <br />the project system continuously in an efficient and economical znanner,: <br />and assume all legal liability for such management, oper.ation, and <br />maintenance. F <br />, <br />�5. Make the services of said project available within its capacit;;r <br />to all persons in the Contractor's service area without discrimination; ' <br />as to race, color; religion, or natural origin at reasonable charges, : <br />including assessments, taxes,�or fees in accordance with a schedule <br />of such charges, whether for one or more classes of service, formally '. <br />adopted�by the Contractor through its board of directors, as may be <br />modified from time to time by the Contractor. The initial rate <br />schedule must be approved by the State. Thereafter, the Contractor � <br />n�ay make such modifications to the rate schedule as the Contractor <br />deems necessary to efficiently and economically provide for the finan-': <br />cial requirements of the system as long as the rate schedule remains <br />reasonable and non-discriminatory, and subject to the approval by the ' <br />State. <br />6. Adjust its operating costs and service charge� from time to ' <br />time to provide for-adequate operation and maintenance, emergency <br />repair seryices, obsolescence reserves, debt servic�, and debt ' <br />reserves. <br />7. Expand the system from time to time to meet reasonable growth: <br />or service requirements in the area within its jurisdiction. , <br />8. Provide the State with such periodic reports as it may require� <br />and permit periodic inspections of its operations and accounts by a <br />designated representative of the State. The Colorado Water Conserva-+ <br />tion Board, its agents, and employees, is hereby designated as the <br />agent of the State for the purposes of this contract. <br />; <br />Page 2 of 5 pages <br />