My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153170 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153170 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2010 3:17:51 PM
Creation date
5/17/2010 3:14:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153170
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 77-35
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
268416 <br />5/10/10 11:4� AM B: 420 P: 0008 <br />Dolores Burns Costilla CountY Recorder Page 1 of 2 <br />QCD Rec Fea: 11.@0 DocFee: $0.00 <br />���� �i � ���■����Ib���� ��'j �'�I�� �'�� ��� �"� �� �� � <br />QUIT CLAIM DEED <br />The Colorado Water Conservation Board ("Grantor"), whose address is 1313 Sherman <br />Street, Room 721, Denver, Colorado, 80203, City and County of Denver, State of <br />Colorado, hereby quit claims to the Trinchera Irrigation Company ("Grantee"), whose <br />address is P.O. Box 41, Blanca, Colorado 81123, County of Costilla, the following <br />property, lying and being in the County of Costilla, to wit: <br />a. A 12,030 foot concrete-lined section, having an average bottom width of 4 <br />feet, of the Sangre de Cristo-Trinchera Diversion Canal. <br />b. A 5,940 foot concrete-lined section, having an average bottom width of 1 foot, <br />of the Lobato Lateral and the Lobato Extension. <br />c. A 1,104 foot concrete-lined section, having an average bottom width of 1 foot, <br />of the Whitehead-Escheman Lateral. <br />d. A 6,600 foot concrete-lined section, having an average bottom width of 2 feet, <br />of the Bean Lateral and the Middle Bean Lateral. <br />e. An 8,077 foot concrete-lined section, having an average bottom width of 2 <br />feet, of the Newton Canal. <br />f. A 2,648 foot concrete-lined section, having an average bottom width of 1.5 <br />feet, of the Grimwood-Smith Lateral. <br />g. A 2,937 foot concrete-lined section, having an average bottom width of 2.5 <br />feet, of the Garland Canal. <br />Together with all necessary appurtenances of a through g above. <br />Executed this �� day of � %L, 2010. <br />GRANTOR: <br />STATE OF COLORADO <br />Bill Ritter, Jr., Governor <br />Acting by and th ugh the <br />Co rad r ervation Board <br />� <br />Tim Feeh n, Finance Section Chief <br />STATE OF COLORADO ) <br />) ss. <br />CITY AND COUNTY OF DENVER ) <br />The foregoing instrument was acknowledged before me this �day of <br />` 2010, by Tim Feehan, as Finance Section Chief of the Colorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.