My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Decree & Stips
CWCB
>
Instream Flow Acquisitions
>
DayForward
>
Final Decree & Stips
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:00:03 AM
Creation date
4/15/2010 3:49:51 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
1-90CW193A
Stream Name
Boulder Creek
Watershed
Boulder
Water Division
1
Water District
6
County
Boulder
Instream Flow Acq - Doc Type
Archive 2
Supplemental fields
Applicant
City of Boulder Donation
Case Number Issue
Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Boulder and <br />Colorado Water Conservation Board <br />Case No. 90CW193 <br />Page 13 <br />Ditch shares, the subject 9.4 Smith and Goss Ditch shares and the <br />subject 2 McCarty Ditch shares at the new alternate points of <br />diversion shall not exceed the lesser of the combined respective <br />limits for those shares as described in paragraphs 3.4.C., 3.5.B. <br />and 3.6.B above or the minimum flow in excess of 15 cfs within that <br />segment of Boulder Creek between the Orodell gage and the Broadway <br />diversion dam, as determined by State water administration <br />officials. <br />IV. CHANGE OF WATER RIGHTS TO INSTREAN upw USE. <br />4.1 The subject meson Ditch Harden Ditch, Marty Ditch, <br />Smith and cis Ditch and Silver Lake Reservoir water rights <br />described in paragraphs 2.1 and 2.3 through 2.6 above are proposed <br />to be changed to add as an alternate type of use and an alternate <br />location of use, instream flow for the protection of the natural <br />environment to a reasonable degree in the following segments of <br />North Boulder Creek and Boulder Creek: <br />Pegment A (North Boulder Creek): That segment of the mainstem <br />of North Boulder Creek in Boulder County from the Silver Lake <br />Diversion Structure, located in the NW1 /4, NW1 /4, Section 34, <br />Township 1 North, Range 73 West of the 6th P.M., at a point <br />approximately 750 feet east and 100 feet south of the NW <br />corner of said Section 34, to the Lakewood Reservoir North <br />Boulder Creek Inlet ( "Lakewood Inlet ") located in the NE1 /4, <br />SE1 /4, Section 1, Township 1 South, Range 73 West of the 6th <br />P.M., at a point approximately 370 feet west and 2000 feet <br />north of the SE corner of said Section 1; <br />pegment B (North Boulder Creek /Boulder Creek): That segment <br />of the mainstem of North Boulder Creek and the mainstem of <br />Boulder Creek in Boulder County from the Lakewood Inlet <br />described above to a point immediately below the discharge of <br />Public Service Company of Colorado's hydroelectric plant at <br />Orodell in the NE1 /4 SW1 /4, Section 34, Township 1 North, <br />Range 71 West of the 6th P.M.; and <br />Segment C (Boulder Creek): That segment of Boulder Creek in <br />Boulder County from a point immediately below the discharge of <br />Public Service Company of Colorado's hydroelectric plant at <br />Orodell in the NE1 /4, SW1 /4, Section 34, Township 1. North, <br />Range 71 West of the 6th P.M., to the 75th Street Bridge near <br />the center of Section 13, Township 1 North, Range 70 West of <br />the 6th P.M. <br />4.2 The subject Boulder City Pipe Line water right described <br />in paragraph 2.8 above is proposed to be changed to add as an <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.