My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990 TNC Board Memo
CWCB
>
Instream Flow Acquisitions
>
Backfile
>
1990 TNC Board Memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 2:08:49 PM
Creation date
4/15/2010 12:54:57 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
92CW0107
Stream Name
Gunnison River
Watershed
Gunnison River
Water Division
4
County
Gunnison
Instream Flow Acq - Doc Type
Correspondence/Memos
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />But reserving exclusively to The Nature Conservancy and <br /> <br />excepting the additional covenant in that same agreement which <br /> <br />provides that P&M will not develop the retained water rights in <br /> <br />a manner such that flows would be diverted from or impounded <br /> <br />within the reach of the Gunnison River from the gage <br /> <br />immediately below the diversion dam for the Gunnison TunneI to <br /> <br />a point one mile downstream of the confluence of the Smith Fork. <br /> <br />Executed this <br /> <br />day of <br /> <br />. 199_. <br /> <br />ATTEST: <br /> <br />THE NATURE CONSERVANCY <br /> <br />By: <br />ITS: <br /> <br />By: <br />ITS: <br /> <br />COUNTY OF <br /> <br />) <br />) ss: <br />) <br /> <br />STATE OF <br /> <br />The foregoing instrument was acknowledged before me this <br />day of . 199 . by <br /> <br />Notary PUblic <br /> <br />My Commission expires <br />
The URL can be used to link to this page
Your browser does not support the video tag.