My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150245 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150245 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:31:18 AM
Creation date
4/5/2010 11:13:48 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150245
Contractor Name
Lower Poudre Augmentation Company
Contract Type
Loan
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 -7 and incorporated herein, shall be an undivided <br />one hundred percent (100 %) interest in 1) the Timnath Flatiron Reservoir and <br />appurtenances, and 2) 4.5 shares of Boxelder Ditch Company, along with the Boxelder <br />Ditch Carriage Agreement, as more particularly described in the attached Deeds of <br />Trust ( "Collateral "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER must submit a written appraisal or opinion of value from a qualified <br />water rights appraiser supporting the purchase price prior to disbursal of loan funds. <br />B. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br />C. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />D. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />E. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />F. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />G. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />H. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />1. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />Appendix 1 to Loan Contract C150245 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.