My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150245 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150245 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:31:18 AM
Creation date
4/5/2010 11:13:48 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150245
Contractor Name
Lower Poudre Augmentation Company
Contract Type
Loan
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: LOWER POUDRE Agency Name: Water Conservation Board <br />AUGMENTATION COMPANY Agency Number PDA <br />Contract No. C150245 <br />Original Loan Amount $3,104,053 <br />Adjustment (Increase): $456,280 <br />Adjusted Loan Amount $3,560,333 <br />LOAN CONTRACT AMENDMENT NO.1 <br />(STANDARD CONTRACT - WAIVER #160 - APPROVED NOVEMBER 10, 2003) <br />This Amendment, made this July 16, 2010, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ( "CWCB "), and the Lower Poudre Augmentation Company, a <br />Colorado nonprofit corporation ( "BORROWER" or "CONTRACTOR "). <br />FACTUAL RECITALS <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />otherwise made available for payment in Contract Encumbrance Number C150245. <br />B. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br />C. The CWCB and the BORROWER entered into Contract Encumbrance Number <br />C150245, dated July 24, 2007 ( "ORIGINAL CONTRACT "), incorporated herein by <br />reference, wherein the CWCB agreed to loan money in the total amount up to <br />$3,104,053, and the BORROWER agreed to repay the loan in accordance with the <br />terms of the ORIGINAL CONTRACT. <br />D. During construction of the Project, the BORROWER encountered unforeseen site <br />conditions, design modifications, and a need for additional work due to changes not <br />anticipated in the original project cost estimate. These items increased the cost of <br />the PROJECT. To meet the increased costs, the BORROWER requested an additional <br />$456,280 for a total loan amount of $3,560,333. <br />E. At its May 2010 meeting, the CWCB approved increasing this loan by $456,280 for a <br />total loan amount of up to $3,560,333 to finance up to 90% of the total Project costs. <br />The terms for the additional loan amount are an interest rate of 2.5% per annum and <br />a repayment period of 30 years. A loan service fee of 1 % is included in the additional <br />loan amount in accordance with CWCB Policy No. 16. <br />F. The CWCB and the BORROWER have agreed to amend this contract to increase the <br />amount of the loan by $456,280 including the 1% loan service fee for a total loan <br />amount of up to $3,560,333 which may be used to finance up to 90% of the total <br />Project cost. <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORIGINAL CONTRACT consists of the payments <br />that shall'be made pursuant to this Amendment and the ORIGINAL CONTRACT, and the <br />promises and agreements herein set forth. <br />2. It is expressly agreed by the parties that this Amendment is supplemental to the <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.