<br />-4- <br /> <br />. A draft costs vs. elevation graph in included in response to requests by the water users. <br />. These numbers are preliminary and the costs will certainly be higher as the Corps completes all <br />work tasks for the study. <br /> <br />CWCB/Corps contract <br />The CWCB and the Corps must <br />complete a contract amendment and <br />commit additional funding for the <br />completion of the study. <br />. The Corps had to terminate the <br />contract with Simons & Associates <br />as main contractor of this Study. <br />The CWCB and the Corps lost <br />considerable time and funds in this <br />effort. <br />. The Corps is now the main <br />contractor for the study and has <br />renegotiated a contract with Tetra <br />Tech for T & E species <br />consultation and preparing the <br />feasibility report. <br />. The current Corps estimate is <br />approximately $1,117,625 for completion of the study. <br />. The CWCB needs an additional $558,812 under the 50/50 cost share agreement. <br />. The CWCB has $150,000 in funds allocated for this project through the "Construction Fund <br />Bill" that is available July 1, 2004. <br />. The CWCB and State Parks may seek $150,000 in kind credits for both Parks and CWCB <br />agency staff time that has been devoted to this project. <br /> <br />Total Cost vs Elevation <br /> <br />80,000,000 <br />70,000,000 <br />60,000,000 <br />_ 50,000,000 <br />'" <br />o 40,000,000 <br />U <br />30,000,000 <br />20,000,000 <br />10,000,000 <br />o <br /> <br />4Y#'$'$'##'4 <br /> <br />Elevation <br /> <br />Note: The red dashed line indicates the reservoir level (5440 MSL) where <br />structural improvements may be needed and the costs may increase <br /> <br />Proiect Meetings and Timeline <br />. Corps will provide a detailed task listltimeline for completion of the study through 2006. <br /> <br />. Corps will present its hydraulic modeling results and probable water supply storage space <br />numbers a the next meeting. <br /> <br />. CWCB will monitor/attend wildlife mitigation meetings for the project. <br /> <br />. Larry Lang - CWCB met with the Corps on April 6th in Omaha, NB regarding reservoir routing <br />procedures. <br /> <br />. The CWCB and the Corps will review reservoir modeling before the next meeting to discuss the <br />flood control and storage space issues related to this study. <br /> <br />. The Corps/CWCBrretra Tech Project Team will conduct regular project meetings. The next two <br />meetings are scheduled for May 5th and June 2nd 1 :30 - 3 :30 PM at Tetra Tech. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />